My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004126
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
35656
>
2600 - Land Use Program
>
QX-91-0005
>
SU0004126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 9:08:38 AM
Creation date
9/4/2019 10:27:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004126
FACILITY_NAME
QX-91-0005
STREET_NUMBER
35656
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35656 S BIRD RD
RECEIVED_DATE
11/18/1997 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\35656\QX-91-05\SU0004126\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 DEPARTMENT OF PUBLIC WORKS: <br /> a Loads on Bird Road and Blewett Road shall be restricted to the legal load limit. (Street <br /> and Highway Title Section 10-2350) <br /> b. Dedicate a 50-foot-wide right-of-way from the northerly right-of-way line of Blewett Road <br /> to the property line, with a 20400t by 204oat comer cut-off (snipe) at Bird Road. <br /> (Development Title Section 9-1150.4 <br /> C. Blewett Road shall be reconstructe in conformance with the standards for a 50-toot-wide <br /> right-of-way rural road from Bird Road to the north main entrance. Bird Road shall be <br /> reconstructed in conformance with the standards for a 60400t-wide right-of-way rural road <br /> from the west main entrance to Blewett Road and for a 50-1oot-wide right-of-way rural <br /> road from Blewett Road to State Route 132 Improvement Plans and Specifications shall <br /> be prepared by a registered Civil Engineer and submitted to the Department of Public <br /> Works for approval. Phasing of pavement section and widening will be allowed as <br /> approved by the Department of Public Works. A Traffic Index of 13 shall be used for road <br /> design purposes. (Development Title Section 9-1150.2) <br /> d. An encroachment permit shall be required for work within the road right-of-way. <br /> (Development Title Section 9-1145.2) <br /> e. A video tape of road conditions on Bird Road from the plant site to State Route 132 and <br /> Blewett Road from Bird Road to Koster Road is required prior to the start of each phase. <br /> The condition of Bird Road and Blewett Road shall be reviewed with Public Works prior <br /> to the start of each phase and every five years thereafter. (Development Title Section 9- <br /> 1415.2) <br /> f. A Maintenance Agreement, along with a bond or cash desposit in an amount acceptable <br /> to Public Works, to ensure repair of Bird Road and Blewett Road damaged by the <br /> applicant's operation will be required. The Agreement will be renewed every five years. <br /> (Development Title Section 9-1415.2) <br /> g. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application and shall be based on the average <br /> daily trip-ends for the 50-year life expentancy of the quarry excavation. The fee currently <br /> is$236.33 per daily trip-end in the Tracy area The Traffic Impact Mitigation Fee may be <br /> offset by construction of improvements identified in the Traffic Impact Mitigation Fee <br /> program. On State highways, funding of up to 50 percent of improvement costs as the <br /> local match to State or other funds may be credited against the fee. (Resolutions R-90- <br /> 304 & R-91-1025)- <br /> h. <br /> -91-1025)"h. The conveyor crossing over Blewett Road shall be equipped with a protection device to <br /> prevent material from falling onto the Blewett Road right-&--way. The conveyor crossing <br /> over Blewett Road shall be removed as approved when quarry operations are completed. <br /> (Development Title Section 9-1025.1) <br /> i. The Bird Road and State Route 132 intersection shall be improved to include acceleration <br /> lanes, deceleration lanes,tum lanes, and radii as necessary. (Development Title Section <br /> 9-1150.2) <br /> Conditions of Approval - 10 - OX-91-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.