My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004126
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
35656
>
2600 - Land Use Program
>
QX-91-0005
>
SU0004126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 9:08:38 AM
Creation date
9/4/2019 10:27:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004126
FACILITY_NAME
QX-91-0005
STREET_NUMBER
35656
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35656 S BIRD RD
RECEIVED_DATE
11/18/1997 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\35656\QX-91-05\SU0004126\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ass MPTiONS UPON WHICH o o <br /> ° P The scope of work and cost provisions of this proposal are based upon several assumptions <br /> that are summarized below. PMC recognizes that these assumptions may be subject to <br /> change by the County during the course of the project. While such changes would not <br /> F1' necessarily result in modification of the scope or cost, PMC reserves the right to propose <br /> such modifications in the event of such changes. <br /> �1 SITE AND VICINITY ACCESS <br /> r Property owners must give access permission before any field review activities may begin. <br /> BUDGET <br /> The cost proposal will remain valid for six (6) months. <br /> The PMC Project Team has budgeted for two team members to attend up to nine (9). <br /> meetings, including public hearings. <br /> The County is responsible for all publishing and mailing costs for the dissemination of the <br /> Draft EIR and Final EIR. <br /> f. All work will be performed at a not to exceed contract price. <br /> } WORK SCOPE <br /> f PMC assumes that this is a Project-level EIR. <br /> The Project Description shall not be substantially changed once approved by the County. <br /> It is assumed that the project applicant will provide detailed information necessary for a <br /> thorough evaluation of the tentative map request as noted in the scope. In order to maintain <br /> [ the project schedule, this information must be available to the consulting team upon notice <br /> to proceed. <br /> F1 The scope of work assumes that there will be' only one (1) round of review of the <br /> Administrative Draft and one (1) round of review of the Administrative Final EIR by the <br /> f County. <br /> The <br /> County will provide PMC with one (1) copy of consolidated comments on these <br /> documents. <br /> The schedule for the completion of the Administrative Final EIR will be based on the receipt <br /> of a complete set of comment letters.- <br /> The estimate to prepare responses to comments on the Draft EIR assumes a moderate level of <br /> Fi, , <br /> effort as described in the scope of work. PMC reserves the right to renegotiate both the <br /> schedule and cost for completion if comments received would require a level of effort <br /> beyond our estimate. <br /> County staff and responsible agencies will cooperate with the PMC Project Team in a timely <br /> manner. <br /> �r <br /> Work shall not be stopped or delayed by the County or others outside of the Project Team. <br /> Should work be so stopped or delayed for a period exceeding sixty (60) days, PMC will be <br /> San Joa urn Counl Communth,Development De cf&nent ' <br /> I ►. � 78 <br /> y <br />
The URL can be used to link to this page
Your browser does not support the video tag.