Fil Below is the proposed EER completion schedule. Our schedule differs from the <br /> timeframe shown in the RFP, as the groundwater and traffic analyses will take <br /> twelve weeks to complete. <br /> 1 PMC has anticipated that a 'Screencheck' Draft EIR and 'Screencheck' Final EIR <br /> a, will be provided to the County prior to printing the final versions of the Draft <br /> EIR and Final EIR. If'Screencheck'versions are not considered necessary by the <br /> t <I County, PMC can reduce the schedule by 1.5 weeks, 1 for Task 3 and 0.5 for <br /> Task 4. <br />{ <br /> 1. Project Initiation 1 <br /> Q F' 2. Project Initiation and Administrative Draft EIRI 14 <br /> Groundwater Study2 (Luhdorff & Scalmanini) 12 <br /> Traffic Analysis2 (kdAnderson) 12 <br /> Air Quality Assessment2Don Ballanti <br /> ( ) 4 <br /> Noise Analysls2 (Bollard & Brennan) 4 <br /> County Review 1.5 <br /> ;:3. Revise Administrative Draft EIR/ Prepare Draft EIR 3 <br /> v <br /> 45-Day Public Review 6.5 <br /> 4 and 5. Administrative Final EIR/ FinalEIR <br /> 3 _ <br /> County Review 1 <br /> Final EIR <br /> 1.5 <br /> 6. Public Hearings, Meetings, and Project Management Throughout process <br /> Total Elapsed Time 31.5 Weeks i <br /> (� 'Estimated Schedule assumes that a cultural resources assessment and revision to the biological assessment will not be necessary <br /> F 'Subconsultant studies will be prepared within the 15-week timeframe for preparing the Administrative Draft EIR <br /> t <br /> I <br /> f <br /> i <br /> Fii <br /> i <br /> F1- II <br /> i <br /> I <br /> F i <br /> I <br /> I <br /> San Joe uln Counj Commun1tv Develo ment De arhnent <br /> F . s 22 j. <br />