Laserfiche WebLink
k <br /> Patrick Angell, AICP <br /> Senior Associate/Project Director <br /> Education <br /> i <br /> B.A., Environmental Science with a government emphasis, California State University, Sacramento <br /> Land Use and Environmental Planning Certificate Program, UC Davis Extension <br /> Ex P�erience and Current Res onsibilities <br /> P <br /> Mr.Angell is a Senior Associate in PMC's Rancho Cordova office,and serves as a project manager and technical <br /> M analyst for a variety of projects. He specializes in environmental and urban land use planning,and has performed <br /> tasks for projects such as water and wastewater facilities, energy facilities, flood control projects, residential <br /> subdivisions, mixed-use urban developments, and redevelopment plans. Mr. Angell's experience includes <br /> preparing urban land use and growth analysis, recreation and visual resource studies, public services assessment, j <br /> transportation and circulation studies, and cultural resource analysis. He has also been involved in the ' <br /> preparation of several CEQA and NEPA documents and technical studies and has over 12 years of environmental <br /> documentation preparation experience. I <br /> Relevant Project Experience <br /> Saratoga Unified School District — Argonuat Elementary School Expansion Mitigated Negative <br /> Declaration,Project Manager. PMC prepared the initial study and mitigated negative declaration for the <br /> planned expansion of Argonaut Elementary School.With the successful passage of Ballot Measure D in- <br /> F1 <br /> n ; <br /> F June of 1997, the Saratoga Union School District received $40 million in General Obligation Bond <br /> proceeds to modernize and expand their four school sites to support the educational program, upgrade <br /> I' the facilities,and accommodate the anticipated growth over the next ten years.Key issues involved traffic <br /> F.P: and traffic safety,visual impacts and tree removal. <br /> ■ Saratoga Unified School District—Foothill Elementary School Expansion EIR,Project Manager. Forthe <br /> expansion of the Foothill Elementary School, PMC acted in an advisory role,guidingthe District through <br /> F the CEQA process, and prepared an EIR that addressed issues such as retaining scenic viewsheds, <br /> increased noise,traffic circulation,and pedestrian safety.The Foothill Elementary School Expansion was <br /> part of the same modernization.and expansion process as that under which the Argonaut School <br /> Expansion was being conducted. <br /> F� <br /> City of Tracy/Tracy Unified School District — Tracy Learning Center EIR, Senior Staff. PMC is <br /> II <br /> F11! <br /> preparingan EIRforTUSDfora new K-12 campuson a b2-acre project site.The Tracy LearningCenter <br /> -- will be developed as a magnet school,ultimately housing over 3,500 students.The campus will include a <br /> community library and senior center in recognition of a project partnership with the City of Tracy. Key <br /> environmental issues include land use, public services, and provision of infrastructure. <br /> ■ City of Rancho Cordova, Rio de Oro Specific Plan EIS/EIR, Project Manager. The Rio del Oro Specific <br /> Plan consists of a mixed-use development project on 3,800 acres located on property previously utilized I <br /> for testing of rocket engines. The project would require an Individual Permit under Section 404 of the <br />'w <br /> " } Clean Water Act for wetland fill. The CEQA lead agency is the Cityof Ranch Cordova,while the NEPA <br /> lead agency is the U.S.Army Corps of Engineers. Key environmental issues include biological resources, <br /> water supply, traffic, hazards and growth effects. <br /> - <br /> PMC. <br /> PACIFIC M U s ICIPAL <br /> C O N'S U L T A N I S <br /> I <br />