My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004126
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
35656
>
2600 - Land Use Program
>
QX-91-0005
>
SU0004126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 9:08:38 AM
Creation date
9/4/2019 10:27:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004126
FACILITY_NAME
QX-91-0005
STREET_NUMBER
35656
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35656 S BIRD RD
RECEIVED_DATE
11/18/1997 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\35656\QX-91-05\SU0004126\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Patrick Angell, AICP <br /> Senior Associate/Project Director <br /> E' <br /> !. ' Placer County, Eaglewood at Tahoe Project EIR, Project Manager. PMC has been retained to prepare <br /> and EIR for the Eaglewood Resort project. Based on the Development Plan submitted by the project <br /> applicant to the County, The 475-acre Eaglewood project consists of 184.6 acres of residential <br /> F,1 development(470 dwelling units)consisting of single-family and single-familytownhomes;276.8 acres <br /> of open space that consists of 151.4 acres of open space, 6.7 acres of park, 11.5 acres for the clubhouse <br /> site(25,000 square feet associated with the clubhouse), 106 acres of golf course(18 holes),and 1.2 acres <br /> of golf course maintenance facilities(7,000 square feet);and 40 affordable housing units.The proposed <br /> project includes development of internal roadways, public and private trails, a single gated entrance, <br /> emergency access points, water supply improvements, connection to the regional sewer system, and <br /> improved storm drainage facilities. Key issues include water quality, groundwater supply issues, deer <br /> F migration issues, affordable housing impacts and traffic impacts. <br /> • Placer County, Hopkins Ranch Project EIR, Project Manager. PMC was retained to prepare an EIR for <br /> the proposed development of 65 residential units and an 18-hole golf course facility on 285 acres in the <br /> Martis Valley area of Placer County. Key issues include visual impacts to Martis Valley; airport safety; <br /> water quality and groundwater supply issues; deer migration issues; affordable housing impacts and <br /> traffic impacts. <br /> Placer County, Sunset Industrial Area Plan EIR, Project Manager. The Sunset Industrial Area Plan <br /> identifies potential improvements to existing conditions and constraints for the purpose of promoting <br /> industrial and commercial development in the 9,000-acre area plan. The project also contributed to the <br /> County's development of a habitat conservation plan. Mr. Angell was the consultant managing this <br /> F'" project. <br /> City of Roseville, Roseville Regional Wastewater Treatment Service Area Master Plan EIR,Task Leader. <br /> The Master Plan.consists of improvements and expansions of the existing regional wastewater system to <br /> service anticipated growth in the.City of Roseville and in the surrounding regional though the year 2015. <br /> Responsible for analyses of land use and growth inducement sections of the EIR. <br /> City of Tracy, Presidio Planned Unit Development and Community Park Project EIR,Assistant Project <br /> Manager. PMC prepared a project4evel EIR for the City of Tracy for the Presidio Planned Unit <br /> Development and Community Park. The project consisted of 550 single-family residential dwelling units . <br /> and a 27-acre community park consisting of four lighted softball fields, four Lighted soccerfields, <br /> concession facility,and storage..The environmental analysis included consideration of the adequacy of <br /> on-site parking facilities at the community park to handle large sporting events, noise impacts to <br /> adjoining residential areas from park activities,traffic impacts from residential uses and sporting events, <br /> and nighttime lighting impacts from sports park facilities. Other key issues included public services and <br /> utilities and the joint-use of a portion of the community park for storm drainage retention. <br /> ■ City of Tracy, Tracy Hills Interim Wastewater Reclamation Facility, Permanent Wastewater <br /> Reclamation Facility and Storm Drainage Improvements EIR, Project Manager. PMC prepared an EIR <br /> for this project that involved specific details regarding planned wastewater and storm drainage <br /> improvements for the Tracy Hills Specific Plan area. Key issues included water quality, groundwater <br /> k contamination, biological resource issues and hazards. <br /> City of Tracy,Tracy Hills Technology Park EIR, Project Manager. This project involved modifications to <br /> the Tracy Hills Specific Plan Land Use Map to allow a mix of.office, research/development and multi- <br /> family land uses within the Plan area east of Interstate 580. Key environmental issues involved water <br /> supply, wastewater capacity, hazardous materials, traffic and noise. <br /> Page 3 <br /> Ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.