My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004126
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
35656
>
2600 - Land Use Program
>
QX-91-0005
>
SU0004126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 9:08:38 AM
Creation date
9/4/2019 10:27:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004126
FACILITY_NAME
QX-91-0005
STREET_NUMBER
35656
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35656 S BIRD RD
RECEIVED_DATE
11/18/1997 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\35656\QX-91-05\SU0004126\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ` Patrick Angell,AICP <br /> g <br /> Senior Associate/Project Director <br /> Fill ■' City of Tracy,John Jones Water Treatment Plant Expansion EIR,Project Manager. PMC completed the <br /> John Jones Water Treatment Plant Expansion EIR, which involves the planned expansion of the City's <br /> water treatment plant to accommodate planned growth in the City. Key environmental issues included <br /> drinking water quality(use of California Aqueduct versus the Delta-Mendota Canal),biological resources, <br /> F, <br /> roadway impacts, air quality and hazards. <br /> E� City of Tracy,Tracy Wastewater Treatment Plant Expansion EIR, Project Manager. PMC was retained <br /> '' to prepare this EIR that involves the expansion of the Ci of Trac Wastewater Treatment Plant to 16 <br /> p p p h` Y <br /> million gallons per day capacity in order to accommodate planned growth. Key issues includes surface <br /> water quality in Old River and the Delta, impacts to fisheries,construction-related impacts and cultural <br /> resource issues. <br /> City of Tracy, Tracy Groundwater Policy Mitigated Negative Declaration, Project Manager. PMC . <br /> prepared the Mitigated Negative Declaration for the Tracy Groundwater Management Policy, which <br /> allows for increased groundwater production by the City. Key environmental issues consisted primarily <br /> of the groundwater resource and quality issues. <br /> Mountain View Power Plant Project Land Use Assessment,Task Manager. The Mountain View Power <br /> Plant project (MVPP) involves the construction and operation of an expansion to the existing 132 MW <br /> (net) Mountain View Power Plant. The expansion would add 1,056 MW (net) of natural gas-fired <br /> combined cycle power to an enlarged site. A gas pipeline,wastewater line, and water supply lines will <br /> be extended to the site. Responsible for overseeing the preparation of the land use section of the Staff <br /> Assessment for the California Energy Commission, as well as attendance at project workshops and <br /> meetings. <br /> ■ Hanford Energy Park Small Power Plant Exemption Land Use and Agricultural Assessments, Task <br /> Manager. The Hanford Energy Park SPPE involves the of an expansion to the existing power plant as <br /> j well as electrical distribution lines,.switchyard and a natural gas pipeline extension. Responsible for <br /> overseeing the preparation of the land use and agricultural sections of the SPPE for the California Energy <br /> Commission, as well as attendance at project workshops and meetings. <br /> 'A Nueva Azalea Power Plant Project Land Use Assessment,Task Manager. The Nueva Azalea Project is <br /> the proposed construction and operation of a 575-megawatt(MW)natural gas and steam electrical power <br /> Fill <br /> plant. Responsible for overseeing the preparation of the land use section of the Staff Assessment for the <br /> California Energy Commission, as well as attendance at project workshops and meetings. <br /> Power Plant Siting Assistance-California Energy Commission, Project Director. Under a contract to <br /> F' <br /> " Aspen Environmental Group, PMC is providing environmental and land use assessment assistance to the <br /> California Energy Commission(CEQ forthe review of power plant applications to the CEC undervarious <br /> application processes. Several of the application processes are in response to the current energy crisis in <br /> the state. ' <br /> Fi' 'J - 4 <br /> Sacramento Regional Wastewater Treatment Plant Master Plan EIR,Task Leader. This project consists <br /> of the improvement and expansion of the Sacramento Regional Wastewater Treatment Plant to meet <br /> Fchanging environmental regulations and future growth demands of Sacramento County. Responsible for <br /> analyses of land use, growth inducement, and visual resources sections of the EIR. <br /> Deer Creek Wastewater Treatment Plant Expansion EIR, Task Leader for Land Use and Growth <br /> ` } <br /> Analyses. The proposed wastewater treatment plant expansion'would provide increased service to the <br /> Y p p <br /> western portion of EI Dorado County which is experiencing substantial population growth. <br /> Page 4 <br /> F"! <br />
The URL can be used to link to this page
Your browser does not support the video tag.