My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012812
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
37268
>
2600 - Land Use Program
>
PP-97-1
>
SU0012812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2020 10:39:13 AM
Creation date
9/4/2019 10:28:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012812
PE
2637
FACILITY_NAME
PP-97-1
STREET_NUMBER
37268
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
26508012
ENTERED_DATE
1/8/2020 12:00:00 AM
SITE_LOCATION
37268 S BIRD RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BIRD\37268\PP-97-1\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The improvements of the Interstate 5/Bird Road Interchange and Road Specific Plan is proposed to be <br /> constructed in two phases. These phases are illustrated in Figures 2 and 3 and are described as follows: <br /> • Phase 1 -This phase, as shown in the attached figure, will include the construction of the <br /> overc <br /> zosstng, the northbound I-5 on-tamp, the southbound I-5'off--ramp, and the Bird Road <br /> extension from the interchange to the southeast to Gaffery Road. It will also include the <br /> realignment of Gaffery Road to intersect with the new county road extension. <br /> • Phase 2 - This phase will complete the construction of the new Bird Road extension <br /> northwesterly to connect with the existing Bird Road. The realignment of Bird Road and <br /> the necessary rehabilitations will be included in this phase. The interchange will be <br /> completed with the addition of the southbound I-5 on- and off-ramps and the eastbound to <br /> northbound I-5 loop on-ramp. <br /> In addition to establishing the specific roadway alignments and right of way requirements for the Bird Road <br /> extension and interchange with Interstate 5, another key component of this Specific Plan process is the <br /> establishment of a financing plan that would pay for the phased construction of the required improvements. <br /> Shown on Figure 4 is a preliminary boundary indicating, based on traffic access, the potential area of <br /> benefit of these proposed improvements. Through this Speck Plan process, a formal financing plan will <br /> be created and adopted by the county Board of Supervisors. Coordination and potential formation of a <br /> Joint Powers Authority (JPA) with Stanislaus County will likely be needed to involve all benefiting <br /> properties in the adopted financing plan. <br /> i <br /> I <br /> Project Description page 5 <br /> Interstate 5/Bird Road Interchange and Road Specific Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.