X. REPORT OF,WASTE DISCHARGE: Submit,a,Report of.Waste Discharge'(RWD).to
<br /> the Callfomia.?Regional Water Quality Control-Board 180 days prior to the stain of,any
<br /> activity'on the site
<br /> Y., INOI:INNIFICATION:` The owner shall defende, inderf,nify, and hold harmless the local
<br /> agency,;or its agents, officers, and employees from, any,,claim. action, or-proceedIr g
<br /> .against the local agency orIts agents,.officers,-or employees to attack,set aside, void, ar
<br /> annul,an ,approval of the.local 'agency,.advisory agency, appeal'-board, or legislative.
<br /> body conceming this Quarry Excavation permit.
<br /> Z. SCREENING: During the:life of the project, one row.of
<br /> evergreThe trees
<br /> en trees shall be maintained around the perimeter of the excavation site:
<br /> shall.be Planted in.such a uanti and location as to achieve an effective visual screen
<br /> within three years of installation Develo ment Title Section 9-1022.4
<br /> aa: SITE CLEANUP: ,Prior to the commencement of operations north of Hospital Creek; the
<br /> existing area being mined south of Hospital Creek shall be cleaned up. The cleanup
<br /> shall include the following: removal of spoils piles, formalize berms, provide uniform
<br /> vegetative cover,-and remove all obsolete, unused, and abandoned vehicles and mining
<br /> equipment.
<br /> 2. DEPARTMENT OF PUBLIC WORKS: (Staff Contact: Tom Iwamiya, 46873023)
<br /> a. The excavation plan shall be prepared by a Registered Civil Engineer and include the
<br /> following (Development Title Sections 9-854.3 and 9-1415.2):
<br /> (1) Detail of access road (first 100 feet from Bird Road shall be paved).
<br /> (2) Final grading plan drainage provision.
<br /> (3) Boundaries and quantities of excavation and direction,of excavation for each
<br /> phase.
<br /> (4) Stockpile area for topsoil.
<br /> b., Loads on Bird Road shall be restricted to legal loads only. (Streets and Highway Title
<br /> Section 10-2350)
<br /> C. A video tape of road conditions on Bird Road, along the haul route, is required prior to
<br /> the start of excavation. The condition of Bird Road shall be reviewed with the
<br /> Department of Public Works prior to the start of excavation and every five years
<br /> thereafter. (Development Title Section 9-1415.2)
<br /> d. A Maintenance Agreement, along with a bond or cash deposit in the amount acceptable
<br /> to the Department of Public Works, shall be required to ensure that if the permittee fails,
<br /> refuses, or neglects to repair, under permit, any damages to Bird Road that may result
<br /> from permittee's operations, the Department of Public Works may do the work necessary
<br /> to restore Bird Road, from the project's entrance to the southern terminus of Teichert
<br /> Aggregates' Bird Road reconstruction, equal to or better than its original condition, using .
<br /> the funds from said bond or cash deposit, subject to review and adjustment for inflation
<br /> every five years. The Maintenance Agreement shall include a requirement that if at the
<br />
|