Laserfiche WebLink
X. REPORT OF,WASTE DISCHARGE: Submit,a,Report of.Waste Discharge'(RWD).to <br /> the Callfomia.?Regional Water Quality Control-Board 180 days prior to the stain of,any <br /> activity'on the site <br /> Y., INOI:INNIFICATION:` The owner shall defende, inderf,nify, and hold harmless the local <br /> agency,;or its agents, officers, and employees from, any,,claim. action, or-proceedIr g <br /> .against the local agency orIts agents,.officers,-or employees to attack,set aside, void, ar <br /> annul,an ,approval of the.local 'agency,.advisory agency, appeal'-board, or legislative. <br /> body conceming this Quarry Excavation permit. <br /> Z. SCREENING: During the:life of the project, one row.of <br /> evergreThe trees <br /> en trees shall be maintained around the perimeter of the excavation site: <br /> shall.be Planted in.such a uanti and location as to achieve an effective visual screen <br /> within three years of installation Develo ment Title Section 9-1022.4 <br /> aa: SITE CLEANUP: ,Prior to the commencement of operations north of Hospital Creek; the <br /> existing area being mined south of Hospital Creek shall be cleaned up. The cleanup <br /> shall include the following: removal of spoils piles, formalize berms, provide uniform <br /> vegetative cover,-and remove all obsolete, unused, and abandoned vehicles and mining <br /> equipment. <br /> 2. DEPARTMENT OF PUBLIC WORKS: (Staff Contact: Tom Iwamiya, 46873023) <br /> a. The excavation plan shall be prepared by a Registered Civil Engineer and include the <br /> following (Development Title Sections 9-854.3 and 9-1415.2): <br /> (1) Detail of access road (first 100 feet from Bird Road shall be paved). <br /> (2) Final grading plan drainage provision. <br /> (3) Boundaries and quantities of excavation and direction,of excavation for each <br /> phase. <br /> (4) Stockpile area for topsoil. <br /> b., Loads on Bird Road shall be restricted to legal loads only. (Streets and Highway Title <br /> Section 10-2350) <br /> C. A video tape of road conditions on Bird Road, along the haul route, is required prior to <br /> the start of excavation. The condition of Bird Road shall be reviewed with the <br /> Department of Public Works prior to the start of excavation and every five years <br /> thereafter. (Development Title Section 9-1415.2) <br /> d. A Maintenance Agreement, along with a bond or cash deposit in the amount acceptable <br /> to the Department of Public Works, shall be required to ensure that if the permittee fails, <br /> refuses, or neglects to repair, under permit, any damages to Bird Road that may result <br /> from permittee's operations, the Department of Public Works may do the work necessary <br /> to restore Bird Road, from the project's entrance to the southern terminus of Teichert <br /> Aggregates' Bird Road reconstruction, equal to or better than its original condition, using . <br /> the funds from said bond or cash deposit, subject to review and adjustment for inflation <br /> every five years. The Maintenance Agreement shall include a requirement that if at the <br />