Laserfiche WebLink
K <br /> y.a <br /> 's APPLICATION -- AGRICULTURAL EXCAVATION <br /> "= { SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA- <br /> i Owners of mineral rights <br /> Name: Address: r] Phone: <br /> i <br /> Name: Address: Phone: <br /> Operator <br /> Name: Address: p (0 Fi -A CA11,4 Phone: <br /> Name: Address: J Phone:. <br /> Agent of process(person designated by operator as agent for the service process) <br /> Name: Address: Phone: <br /> REQUIREMENTS AND STANDARDS <br /> 5-76 r n 9,ra 7 <br /> The following requirements must be met by any approved Agricultural Excavation: <br /> • Slopes: For a complete discussion on slope requirements,see the San Joaquin County Development Title. <br /> • Hours of Operation: Excavation operations shall not be carried on during the hours from 9.00 p.m.through 5:00 a.m.,except during <br /> periods of declared national,state or local emergency. Said hours are based on either Pacific Standard Time or Pacific Daylight <br /> Saving Time,whichever is legally in effect. (Note: The hours of operation may be modified by the review authority based upon the <br /> excavation's potential effect on surrounding land uses. <br /> • Lighting: Any night lighting established on the property must be arranged and controlled so as not to illuminate public rights-of-way or <br /> adjacent properties. <br /> • Air Pollution Control: All emissions are subject to the rules and regulations of the San Joaquin County Air Pollution Control District. <br /> r • Topsoil Replacement: During the excavation,the topsoil must be set aside. Upon completion of an'excavation,the topsoil shall be <br /> replaced and the site leveled in conformance with the Reclamation Plan. (Note: This requirement may be waived if a soils report <br /> indicates the replacement of the topsoil will not enhance the agricultural suitability of the property. In such cases, the topsoil may be <br /> removed from the site) <br /> • Weed Control: Operations shall be in accordance with instructions from the Agricultural Commissioner to control the spread of <br /> noxious weeds. <br /> • Health and Vector Control: The excavation must not cause health or sanitary hazards and shall not create conditions which will cause <br /> the breeding or increase of mosquitoes,rodents or other pests. <br /> • Reclamation: The reclamation of each phase shall be completed in conformance with the reclamation plan within two years of <br /> completion of the extraction portion of that phase. (Note: Reclamation shall be completed as soon as feasible. The schedule for <br /> reclamation will be a part of the approval of the excavation. It will define each phase of the excavation. The phases may be based on <br /> the sequence in which individual areas are to be excavated and reclaimed,or on the s@quence in which various operations are to be <br /> carried out on each area of the excavation. In either case,the reclamation schedule shall clearly state the operations to be carried out <br /> in each area during each phase.) <br /> • Annual Inspection: The applicant must pay a fee to the County to cover the cost of an annual inspection of the excavation to assure <br /> compliance with the provisions of the permit. <br /> • Performance Guarantee: A specific condition on performance guarantee is required to ensure reclamation of the site and compliance <br /> _ with conditions of approval. The amount of the guarantee is and will be fully in force during the life of the permit. The estimated cost <br /> of reclaim nt e site-shall a reviewed annUbIly p(- '..anciat-guaproposed-by---- <br /> the applicant under this Section must be found acceptable by County Counsel. The financial guarantee shall be made payable to <br /> "San Joaquin County and the Department of Conservation". The type of financial guarantee shall be one of the following: <br /> a) Surety bond, <br /> b) Irrevocable letters of credit, <br /> C) Trust fund. <br /> FADEVSMPlanning Application Formsl Page 5 of 15 <br />