My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008255
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOULTON
>
401
>
2600 - Land Use Program
>
PA-1000095
>
SU0008255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:25 AM
Creation date
9/4/2019 10:31:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008255
PE
2606
FACILITY_NAME
PA-1000095
STREET_NUMBER
401
Direction
S
STREET_NAME
BOULTON
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
5/17/2010 12:00:00 AM
SITE_LOCATION
401 S BOULTON RD
RECEIVED_DATE
5/14/2010 12:00:00 AM
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BOULTON\401\PA-1000095\SU0008255\APPL.PDF \MIGRATIONS\B\BOULTON\401\PA-1000095\SU0008255\EH COND.PDF \MIGRATIONS\B\BOULTON\401\PA-1000095\SU0008255\Document.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6� <br /> z: <br /> �- APPLICATION - AGRICULTURAL EXCAVATION <br /> _ SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA- <br /> R"koR'� <br /> RECLAMATION PLAN <br /> GENERAL INSTRUCTIONS <br /> Introduction <br /> The California Surface Mining and Reclamation Act(SMARA)requires that mining applicants submit a reclamation plan to, and <br /> receive approval of the plan by,San Joaquin County prior to commencement of operations. SMARA defines reclamation as <br /> "...the combined process of land treatment that minimizes water degradation,air pollution,damage to aquatic or wildlife habitat, <br /> flooding,erosion,'and otheradverse effects from surface mining operations, including adverse surface effects incidental to <br /> underground mines, so that mined lands are reclaimed to a usable condition which is readily adaptable for alternate land uses <br /> and create no danger to public health and safety." The statute goes on to explain that"The reclamation plan shall be applicable <br /> to a specific piece of property or properties,and shall be based upon the character of the surrounding area and such <br /> characteristics of the property as type of overburden,soil stability, topography, geology,climate, stream characteristics, and <br /> principal mineral commodities." <br /> A reclamation plan represents a legal commitment by the applicant. The plan should clearly describe how reclamation will be <br /> accomplished in terms that can be easily understood. Deviations from the approved plan must not be undertaken until such <br /> amendment has been filed with,and approved by,the Community Development Department. <br /> General Instructions <br /> When.preparing a reclamation plan, it is important to provide the County and other agencies with adequate information to review <br /> the proposal. The reclamation plan should describe how potential adverse environmental impacts will be prevented or minimized <br /> and how the mined lands will be successfully reclaimed to a useable condition which is readily adaptable for alternative land uses. <br /> By providing adequate information initially, applicants can lessen the chance of requests for additional information that will slow <br /> the approval process. <br /> SMARA requires that a reclamation plan include: <br /> (1)a description of the environmental setting of the proposed operation, <br /> (2)a description of the proposed mining plan,and <br /> (3)a plan for reclaiming the site. <br /> SECTION l: DESCRIPTION OF ENVIRONMENTAL SETTING <br /> Include a description of the environmental setting of the proposed mining operation. Describe the environmental conditions of the <br /> area prior to mining in sufficient detail to permit the impacts of the proposed mining operation to be assessed. Please refer to the <br /> attached checklist for developing a description of the environmental setting(use the outline format for easy reference.) <br /> SECTION It: DESCRIPTION OF PROPOSED MINING OPERATION <br /> Include a description of the proposed surface mining operation. Sufficient detail should be provided to permit the environmental <br /> impacts of the proposed mining operation to be assessed. Please refer to the attached checklist for developing a description of <br /> the mining operation. ` <br /> SECTION Ill: DESCRIPTION OF PROPOSED RECLAMATION <br /> Include a description of how adverse environmental impacts will be prevented or minimized and the manner in which reclamation, <br /> adequate for the proposed use or potential uses,will be accomplished. Please refer to the attached checklist for developing a <br /> reclamation plan. Conditions of approval imposed by the administering agency should become part of the reclamation plan by <br /> incorporation or attachment. <br /> evia Ions r�om tTie approve rec am n purr dmentirasbeerr-f'tk.c ith,and-approved-by; <br /> the Community Development Department. Any successor or assignees in interest of a surface mining operation are required to <br /> assume responsibility for meeting the terms of the approved reclamation plan. <br /> FMEVSVCIPianning Application Formsl Page 6 of 15 d <br /> Agricultural Excavatlon.doc.(Revised 02-03-10) <br />
The URL can be used to link to this page
Your browser does not support the video tag.