Laserfiche WebLink
s <br /> Item No. 3 <br /> PC: 5-6-93 <br /> UP-9231 <br /> Page 13 <br /> g. All required plans and building permit applications shall be submitted within 60 days of <br /> the application's effective date, and all Fire Code related improvements shall be <br /> completed within six months of the application's effective date. <br /> 6. RECLAMATION BOARD: <br /> a A Reclamation Board permit shall be required prior to the start of any work within the San <br /> Joaquin River project floodway and levees and within 10 feet landward of the landside <br /> levee toes, as required by Section 8716 of the California Water Code. <br /> F <br />