Laserfiche WebLink
{ <br /> y <br /> engineering study to evaluate the adequacy of Bowman Road to handle truck traffic. If the stud <br /> shows that Bowman Road is adequate for truck traffic,the applicant may pay a one-time roadway <br /> and maintenance impact fee to the County Department of Public Works in the amount of <br /> $10,000.00. <br /> f. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and <br /> payable at the time of building permit application: The fee currently is$159.47 per trip-end in the <br /> Lathrop area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. The number of trip-ends <br /> may be determined by a proportion to the length in time of the excavation operation. (Resolution <br /> 00-433) <br /> v g. The applicant shall show the highest recorded groundwater elevation of+2.2 on the plans. <br /> 4. DEPARTMENT OF PUBLIC HEALTH SERVICES (Staff Contact:Lisa Medina,468-3455) <br /> a. No excavation is permitted into the groundwater table without specific approval <br /> from the Regional <br /> Water Quality Control Board, Central Valley(Water Code, Chapter 4,Article 3, Section 13240). <br /> b. The materials from an excavation shall not be deposited into any water course nor in any way <br /> contribute to the pollution thereof. (California Water Code, Section 13376) <br /> c. An approved potable water supply must be provided for all employees. (Development Title Section <br /> 9-1100.1) <br /> d. Approved sanitary facilities must be provided for all employees. (Development Title Section 9- <br /> 1100.1) <br /> 5_ CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD (Seethe attached letter dated August <br /> 22,2001.) <br /> I <br /> Conditions of Approval -3- QX-01-1 <br />