My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012817
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOWMAN
>
360
>
2600 - Land Use Program
>
QX-01-01
>
SU0012817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 1:35:37 PM
Creation date
9/4/2019 10:33:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012817
PE
2605
FACILITY_NAME
QX-01-01
STREET_NUMBER
360
Direction
W
STREET_NAME
BOWMAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
APN
193-260-22
ENTERED_DATE
1/9/2020 12:00:00 AM
SITE_LOCATION
360 W BOWMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BOWMAN\360\QX-01-01\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C,) <br /> j. CERTIFICATION OF COMPLIANCE: At the completion of each phase of the grading,the applicant <br /> shall have a registered civil engineeror licensed land surveyor compare the excavation's final <br /> elevations with the approved permit. The engineer or surveyor shall submit a certified,written finding <br /> to the Directorwhich states and documents the compliance or non-compliance of each phase of the <br /> excavation with the approved permit. if Phase 1 of the project conforms with the approved permit, <br /> the Review Authority shall accept the certification and either notify the applicant that the stockpiled <br /> material may be removed or release the required performance guarantee,as specified in subsection <br /> j.(2). If Phase 2 of the project conforms with the approved permit,the Review Authority shall accept <br /> the certification and either notify the applicant that the stockpiled material may be removed or release <br /> the required performance guarantee,as specified in subsection k.(2). <br /> k. PERFORMANCE GUARANTEE: To ensure that each phase of the excavation is completed in <br /> conformance with the approved permit,the operatorshall either: <br /> (1) Stockpile, on the property, all material to be removed from the site for each phase, pending <br /> acceptance of the certification of compliance by the Director. Stockpiled-material shall be set <br /> back at least 25 feet from any property or road right-of-way line;or <br /> (2) Secure a performance bond or other financial security sufficient to cover the cost of rehabilitation <br /> of the site for agricultural use. The form of the bond or other financial security shall be found <br /> acceptable by County Counsel. The amount of the security shall be found acceptable by County <br /> Counsel. The amount of the security shall be approved by the Director. <br /> 2. CENTRAL CALIFORNIA INFORMATION CENTER (Staff Contact: Robin Hards, 209-667-3307) <br /> a. If any historical resources are discovered during project-related construction activities, all work is . <br /> to stop and the lead agency and a qualified professional are to be consulted to determine the <br /> importance and appropriate treatment of the find. If Native American remains are found, the <br /> County Coroner and the Native American Heritage Commission, Sacramento (916-653-4082) are <br /> to be notified immediately for recommended procedures. <br /> 3. DEPARTMENT OF PUBLIC WORKS(Staff Contact: Gabriel Karam, 468-3000) <br /> a. The excavation plan shall be prepared by a Registered Civil Engineer or Land Surveyor and include <br /> the following: <br /> (1) Detail of access road (first 100 feet from Bowman Road shall bean all weather road). <br /> (2) A haul route plan detailing County roads utilized in accessing the quant'. <br /> (3) Stockpile area for topsoil(no excavation or stockpile shall be allowed within 25 feet of the <br /> property boundary or the County right-of-way). <br /> b. All private roads involved in an excavation shall be maintained so as to control dust. <br /> c. Loads on all public roads shall be required to be legal loads.only. (Street and Highway Title Section <br /> 10-2350) <br /> d. An encroachment permit shall be required for work within the road right-of-way. (Development Title <br /> Sections 9-1145.4 and 9-1145.5) <br /> e. A Maintenance Agreement shall be executed by the applicant to ensure that Bowman, Manthey, <br /> and all other roads designated by the haul route plan are maintained in a condition acceptable to <br /> San Joaquin County. In lieu of a Maintenance Agreement,the applicant may prepare an <br /> Conditions of Approval -2- QX-01-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.