My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012817
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BOWMAN
>
360
>
2600 - Land Use Program
>
QX-01-01
>
SU0012817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 1:35:37 PM
Creation date
9/4/2019 10:33:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012817
PE
2605
FACILITY_NAME
QX-01-01
STREET_NUMBER
360
Direction
W
STREET_NAME
BOWMAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
APN
193-260-22
ENTERED_DATE
1/9/2020 12:00:00 AM
SITE_LOCATION
360 W BOWMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BOWMAN\360\QX-01-01\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the County will permit the average finished grade elevation to be no lower than 13.9 feet. Mr. <br /> Noceti explained the topography on the project, and sounding properties. Mr. Martin asked Mr. <br /> Noceti if he thought it would make a difference for him to take a look at the site and that he <br /> would be happy to do this. A meeting was set to meet the applicant at the project. <br /> Mr. Martin informed the applicants that they may take the project to the Planning Commission <br /> and present their case. <br /> Mr. Neely reviewed the Department of Public Works memo. <br /> Mr. Martin reviewed the Native American Heritage Commission letter with the applicants. <br /> Mr. Martin informed the applicants that they will need to contact the Native American Heritage <br /> Commission prior to scheduling the project for the Planning Commission. <br /> ------------------------------------------------------------------------------------------------------------------------------- <br /> 10:30 a.m. 4. GENERAL PLAN AMENDMENT APPLICATION NO. GP-01-8 & <br /> JJ ZONE RECLASSIFICATION APPLICATION NO. ZR- 01-7 OF LTH <br /> TRUST (CIO LEE & MARYCLARE HELMS). A General Plan <br /> Amendment application to change the map designation of a portion of <br /> 239-060-04 from General Agriculture (AIG) to Limited Industrial (IIL) and <br /> a Zone Reclassification application to change the zoning of a portion of <br /> APN: 239-060-04 from C-X (Crossroads Commercial) to I-W(Warehouse- <br /> Industrial). Located on the northwest corner of intersection of Interstate 5 <br /> and Kasson Road, Tracy (APN: 239-060-04; Address: 23100 S. Kasson <br /> Road, Tracy). <br /> The applicant did not show for this item. <br /> ------------------------------------------------------------------------------------------------------------------------------- <br /> 11:00 a.m. 5. SITE APPROVAL APPLICATION NO. SA-01-57 OF ACLC, INC. <br /> CM A Site Approval application for multi family-housing development, 76 <br /> living units and a day care multi-purpose facility. Located on the north <br /> side of Farmington Road, 450' east of Sinclair Avenue, Stockton (APN: <br /> 173-260-15; Address: 4701 East Farmington Road, Stockton). <br /> Chandler Martin, Senior Planner; Phillip Espalin, Architect; Suzanne Stone; ACLC, Inc. were <br /> present for this item. <br /> Mr. Martin reviewed the Development Committee memo. <br /> Mr. Martin indicated that the storm drainage would be draining to an on site pond that was off <br /> site. Mr. Martin asked the applicants if they had any plans to screen the pond. Mr. Espalin <br /> indicated that they would have a six foot high concrete block wall all the way around the site. <br /> Mr. Martin asked how the building would be accessed. Mr. Espalin indicated that between <br /> buildings 10, and 11, there is a twenty-foot wide space where a walkway will be placed. Mr. <br /> Martin asked if that would be okay with the Public Works Department. <br /> Mr. Martin informed the applicants that before the Site Approval application can be approved <br /> they will need to have the Density Bonus request completed and a revised Site Plan showing <br /> drainage provisions and location of the masonry wall. <br />
The URL can be used to link to this page
Your browser does not support the video tag.