Laserfiche WebLink
` CONDITIONlS OF APPROVAL <br /> - - . <br /> : . SA 91 2 <br /> 3 <br /> PAGE FIVE <br /> c. Construct a water well under permit and inspection of the <br /> Environmental Health Division prior to occupancy. Should the <br /> number of non-resident individuals exceed 24 for at least 60 <br /> days per year, or the number of service connections exceed <br /> four, a yearly permit t0 operate a public water system under <br /> t <br /> the provisions of Title 22, CCR, will be required by the :. <br /> Environmental Health Division. <br /> d. If floor drains are required, they must be plumbed through a' .' <br /> sand/oil separator and discharged to an above ground system ;. <br /> approved by the Environmental Health Division. This system <br /> must be designed by a registered engineer. The applicant must <br /> file an application for facility permit/waste discharge with <br /> the Central Valley Regional Water Quality Control Board. . The <br /> application forms can be obtained from the environmental <br /> Health Division. If the above. ground holding facility had to <br /> be . emptied you first would have to analyze the contents for <br /> any hazardous - material. Your can obtain specific test <br />' requirements from the Environmental Health Division. <br /> E e If hazardous material is stored on site the applicant must <br /> `. register with the County Office of Emergency Services., <br /> 4.. BUILDING DIVIOSION <br /> ORDINANCE REQUIREMENTS: <br /> The Ordinance Requirements listed below have been identified as <br /> pertinent to this project. Other Ordinance Requirements may also <br /> apply. Ordinance Requirements cannot be modified. <br /> a. The following Uniform Building Code and San Joaquin Ordinance <br /> 'requirements will be applicable and shall incorporated in the <br /> construction plans before submittal to the Building Inspection <br /> Division: <br /> 1) Exterior walls less than 20 feet from a property line <br /> shall be of one-hour, fire-resistive construction. <br /> 2) The proposed building shall be provided with an automatic <br /> : fire sprinkler system or divided into areas. less than <br /> 6, 000 square feet by area separation walls€ <br /> �t } 3) Provide restrooms conforming with all disabled access <br /> ;.requirements (C.C.R. , Title 24) . <br /> i <br /> i <br />