My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004593
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
13751
>
2600 - Land Use Program
>
SU-00-01 (TE)
>
SU0004593
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:10:47 AM
Creation date
9/4/2019 10:35:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004593
PE
2622
FACILITY_NAME
SU-00-01 (TE)
STREET_NUMBER
13751
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
APN
01906029
ENTERED_DATE
8/6/2004 12:00:00 AM
SITE_LOCATION
13751 E BRANDT RD
RECEIVED_DATE
8/4/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\13751\SU-00-01\SU0004593\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> IMPROVEMENT PLAN SUBMITTAL CHECKLIST <br /> A. The following items must be submitted to the Public Works Department before <br /> the Improvement Plans can be checked: <br /> 1. Preliminary Engineer's estimate. <br /> 2. Plan check fee based on the preliminary Engineer's estimate (excluding <br /> contingencies): <br /> a. 5.5% for the first $25,000.00 <br /> b. Plus 3% for the next $225,000.00 <br /> c. Plus 1.75% over $250,000.00 <br /> 3. 4-complete sets of Improvement Plans (blueline) <br /> 4. 4-sets of Specification books <br /> 5. 1-complete set of Preliminary Soils Report including R-values and <br /> structural section calculations. <br /> 6. Storm drain calculations (Hydrology, sub-area map, pipe line, hydraulic <br /> design, ponding basin, pump system, etc., if applicable). <br /> 7, Water and sanitary sewer design data and calculations if applicable. <br /> 8. 1-Draft Final Map <br /> B. Field Inspection fee based on approved Engineer's estimate (excluding <br /> contingencies): <br /> 1. 4.00% first $200,000.00 <br /> 2. Plus 3.00% over $200,000.00 to $500,000.00 <br /> 3. Plus 2.50% over $500,00'1.00 to $1,000,000.00 <br /> 4. Plus 2.00% over $1,000,000.00 <br /> PLANCNEK6f96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.