Laserfiche WebLink
• A <br /> E. WASTEWATER <br /> 1=1. Potent1211y Slanificarrt Impact: Increased demand forwastewatertreatment and collection„faciiitles, <br /> FIn„ dtno <br /> Changes or alterations have been required in, or incorporated Into, the project which avoid or <br /> substantially lessen the significant environmental effects as identified In the Final EIR. These <br /> mitigation measures are listed below. <br /> Statement of Fact: <br /> This Impact will be reduced by the following: ' <br /> • A"will serve'letter was submitted with the Major Subdivision application which states that <br /> the Lockeford Community Services District Is willing and able to provide public sewer <br /> service for this project. <br /> • The developer will make necessary Improvements to the wastewater system to ensure <br /> that sewage disposal for this development Is adequately provided for <br /> F. ' STORM DRAINAGE AND FLOOD CONTROL <br /> F.1. Potentia! SI nricant Impact: Increased runoff due to the construction of impermeable surfaces. <br /> Finding: <br /> Changes or alterations have been required in, or Incorporated Into, the project which avoid or <br /> substantially lessen the significant environmental effects as identified in the Final EIR. These <br /> mldgadon measures are.listed below. . <br /> Statement of Fact, <br /> This Impact vall be reduced by the provision of a terminal drainage system that wig utilize the <br /> proposed 26-acre lake on the site to detain storm water runoff that will ultimately evaporate or be <br /> released Into Bear Creek. <br /> F.Z Potentially Sicunific2nt Impact: Poor mafntenanca and re ufation of the •ro ect lake could result <br /> Ih water quality, aesthetic,and safety problems <br /> FndInT. , <br /> Changes or alterations have been recpAred In, or Incorporated Into, the project which avoid or <br /> substantially lessen the significant environmental effects as Identified In the Final EIR. These . <br /> mitigation measures are listed below. <br />