Laserfiche WebLink
i <br /> E. WASTEWATER <br /> E.1, potentially Significant Impact: Increased demand for wastewater treatment and collection facifftles. <br /> Finding: <br /> Changes or alterations have been required In, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effects as identified in the Final EIR. These <br /> mitigation measures are listed below. <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> • A%vill serve'letter was submitted with the Major Subdivision application which states that <br /> the Lockeford Community Services District Is willing and able to provide public sewer <br /> service for this project <br /> • The developer will make necessary improvements to the wastewater system to ensure <br /> ;..', that sewage disposal for this development Is adequately,provided for. <br /> F. STORM DRAINAGE AND FLOOD CONTROL <br /> F.I. Potentially Significant Impact: Increased runoff due to the construction of impermeable surfaces. <br /> Finding:- <br /> Changes or alterations have been required in, or Incorporated Into, the project which avoid or <br /> substantially lessen the significant environmental effects as identified in the Flnai EIR. These <br /> mitigation measures are.Usted below. <br /> Statement of Fact: <br /> This Impact will be reduced by the provision of a terminal drainage system that will utilize the <br /> proposed 26-acre lake on the site to detain storm water runoff that will ultimately evaporate or be <br /> released into Bear Creek. <br /> F.2 Potentially_Signlficant Impact: Poor maintenance and regulation of the prolect lake could-result <br /> Ih water quality, aesthetfc and safety problems. <br /> Finding: <br /> Changes or alterations have been required In, or Incorporated Into, the project which avoid or <br /> substantially lessen the significant environmental effects as Identified in the Final EIR. These <br /> mitigation measures are listed below. <br /> -35- <br />