My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012823
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
13751
>
2600 - Land Use Program
>
ZR-92-13
>
SU0012823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2020 8:38:10 AM
Creation date
9/4/2019 10:36:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012823
PE
2666
FACILITY_NAME
ZR-92-13
STREET_NUMBER
13751
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
Zip
95240-
APN
01906029
ENTERED_DATE
1/10/2020 12:00:00 AM
SITE_LOCATION
13751 E BRANDT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\13751\ZR-92-13\SU-00-01\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. AIR QUALITY <br /> C.1. Potential!y Significant Impact, Project related construction activities will result in dust peneratian <br /> Findin <br /> Changes or alterations have been required In, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effects as Identified in the Final EIR. These <br /> mitigation measures are listed below. <br /> Statement of Fact: <br /> This impact will be mitigated via the implementation of dust control measures as required by the <br /> San Joaquin Valley Unified Air Pollution Control District during all construction and grading on the <br /> site. <br /> D. PUBLIC WATER SUPPLY <br /> D.1. Potential Sign cant Impla. Increased demand for water. <br /> The site has most recently been used for cattle grazing, with only minimal use of water. The <br /> project as proposed will create an increased demand for water. <br /> Finding: <br /> Changes or alterations have been required in, or incorporated Into, the project which avoid or <br /> substantially lessen the significant environmental effects as ident'if'ied in the Final EIR. These <br /> mitigation measures are listed below.., <br /> Statement of Fact: <br /> This Impact will be reduced by the following: <br /> • A•will serve'letter was submitted with the Major Subdivision application which states that <br /> the Lockeford Community Services District (LCSD) Is willing and able to provide water <br /> service for ibis project. <br /> • The developer is proceeding with annexation to the District. <br /> • The developer will make necessary improvements to the water system to ensure that the <br /> needs of this development are adequately met. . <br /> • The lake will be filled by utilizing wader runoff and groundwater. The well that will be used <br /> to pump groundwater is approximatety 137 feet deep. The wells used by the LCSD are <br /> between 500 and 700 feet deep. The lake will pump nonpotabie water from a shallow <br /> aquifer, which is expected to have no impact•on the District's wells. f <br /> -34- <br />
The URL can be used to link to this page
Your browser does not support the video tag.