Laserfiche WebLink
4. Construction of an individual domestic water well under permit and inspection <br /> by the Environmental Health Division is required at the time of development. <br /> for Parcel #1, Parcel #2, and Parcel #4. The designated parcel has a test <br /> well on it that has been grouted 200 feet by Purviance Drillers. This well may <br /> be used in the future if it can provide a safe potable water supply. This test <br /> well was drilled under permit. <br />