Laserfiche WebLink
February 13, 2006 <br /> NOA Project Number:E05174A <br /> Page 2 <br /> rainwater The rec&of h to ,ta 'on is presented in terms of total pounds of++itrnar r <br /> andpounds of�nitro>zen ver acre peLYear. The information presented in this letter should be <br /> viewed as an initial estimate. <br /> The result of the nitrogen loading calculation is that 146,608 lbs Nitrogen(N)per year may be <br /> applied to land. This is a worct ace k=Dgnn s assumes tfia perces o c o <br /> be hauled off site eventually increasing to 100 percent being hauled off site. The nio_p, r . <br /> loadine is 21$ lbs N ver acre ver year i x11673.81 g es were avaijpbje �� <br /> a iFlicationjif <br /> only half of the land was available the result would be436 lbs__N�St acrc). The resulting load <br /> from only the rain water and septic system would be 2 218 lbs N total(about 3 lbs=acre), <br /> This aspect was ditraesed in the-4n,1 Corral,1, a T',.,y i a• <br /> •y. <br /> Our professional services were performed, our findings obtained, and our conclusions proposed <br /> in accordance with generally accepted engineering principles and practices. This warranty is in <br /> lieu of all other warranties either expressed or implied. Test findings and statements of <br /> professional opinion do not constitute a guarantee or warranty, expressed or implied. <br /> If you have any questions,please do not hesitate to call. <br /> Be s ands, <br /> J. Geo <br /> avid Welch, Principal Geologist <br /> CEG-2151, CHG-653, GP-1049 C?��C J wFI�O0 <br /> Q� Nu. 2151 y <br /> CERTIFIED <br /> cc: SKS Enterprises d\N� FNGINEERINGGEDI.OGISI' �cr <br /> Lisa Medina, EHD <br /> OF CAi tF0 <br /> attachment: work sheet <br />