My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004532 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
23709
>
2600 - Land Use Program
>
PA-0400365
>
SU0004532 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:52 AM
Creation date
9/4/2019 10:37:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004532
PE
2632
FACILITY_NAME
PA-0400365
STREET_NUMBER
23709
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
Zip
95240
APN
02317008
ENTERED_DATE
7/6/2004 12:00:00 AM
SITE_LOCATION
23709 E BRANDT RD
RECEIVED_DATE
6/30/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\23709\PA-0400365\SU0004532\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> i <br /> December 23, 2005 <br /> NOA Project Number: E05174A --- - <br /> /3.3 Current On-Site Sources of Nitrate '-- <br /> Rain water, septic system usage, and manure associe I : <br /> potential sources of nitrogen on the site. <br /> 3.3.1 Existing Septic System ----1 <br /> Existing septic stem use is discussed in Section 3 <br /> p Y � <br /> ' 3.3.2 Agricultural Contribution; Overview of <br /> r <br /> The following information was provided to our office from Mr. Rolando Calderon,Production <br /> Manager of SKS Enterprises Incorporated. We understand that manure for composting will <br /> r originate from the two new bird houses located on the north side of parcel 023-170-08. <br /> =� Construction on two more houses is planned to begin shortly. Each house will have about 120,000 <br /> birds;two houses presently operate. Each bird house generates about 15 to 20 yards of manure per <br /> day. The manure will be transported to the composting house for conversion to compost. <br /> Composting is a five day process. Composting is required for chicken manure to reduce the <br /> strength of the manure into a beneficial soil amendment. Composting involves rotation and <br /> movement of the compost by machinery during the five day process. The composting house is <br /> rectangular in shape and contains concrete floors and sidewalls. The concrete was required to <br /> prevent the manure and compost from entering the ground. The composting house is covered, <br /> protecting it from rain fall. After.the composting process is complete, the compost will either be <br /> given away and/or may be applied to the land. Later, SKS Enterprises hopes to bag and ship the <br /> F entire production of compost to market for profit. <br /> The percentage of application to the land is estimate to be less_tha 50 ercent initially and irH�- <br /> f <br /> Years no -= fmr,o.st.-The compost Eliot will be applied-to land will be disked into <br /> the gro � .- ,, ^-.� rcnmental Health Specialist, <br /> indicated �G�i � r the stream <br /> drainage water bodies. <br /> Ad_ etailot -� `� ~ .lication areas <br /> and the. lrhc 6riposting ?7 F <br /> process '�1� <br /> 7 4 � �C2 �S <br /> ',,IZThe str a� ng was possible <br /> on 'vI ` �� that <br /> chickei / information <br /> indicat <br /> tr <br /> un the volume <br /> D <br /> losses �� �� Uy the pounds <br /> per ye <br /> 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.