Laserfiche WebLink
• Keep drop inlet in wash area free of debris. <br /> • Monitor erimeter impoundment for capacityP roblems during storm events. <br /> P P <br />' r 5.6.4 Boneyard <br /> • Keep stored materials and equipment cleaned and free of extraneous oil and <br /> grease and other potential contaminants. <br /> 5.6.5 Pristine Areas <br /> 1 When practical, berm or otherwise redirect surface water flows around active <br /> and unreclaimed mine areas. <br /> 5.7 Inspection and Maintenance Reporting <br /> All inspections are to be performed by personnel as directed in Sections 5.1 and 5.2. <br /> Inspections will consist of the following: <br /> Il Annual Facility Inspection - Shall be conducted to verify that all elements of <br /> the Plan (Le., site plan, potential pollutant sources, structural and'non- <br /> structural storm water management controls, etc.) are accurate. Shall identify <br /> changes to the plan that are required due to operational or permit changes <br /> which maintain the general Policy and Objectives as outlined in Section 1.1 of <br /> the Plan. <br /> The conclusion to the Annual Facility Inspection will be a certification that the <br /> 8 facility is in compliance with the requirements of the Pian. Certification <br /> requirements are as presented in Section 6.0. <br /> r� <br /> r Operations and Facilities Inspection - Shall be performed as presented in the <br /> Schedule of Inspections and Training (Appendix B) to verify that actual <br /> operations are in compliance with the Plan and to ensure that storm water <br /> r, controls are satisfactory. <br /> Inspection reports are to be filed with the Facility Operations Manager for inclusion in the <br /> Plan by the 15th of the month in which the inspection was performed. Inspection reports <br /> shall identify areas needing correction along with follow-up dates. The Facility Operations <br /> Manager shall establish a "tickler file" to provide adequate follow-up for corrections and <br /> maintenance. Maintenance records and records of correction shall be incorporated in the <br /> Plan. <br /> Storm Water Managpment Pian-KRC Aggregate Inc. <br /> BSK Project Na 5921042 11 <br /> Revised January 1994 <br /> . s <br />