My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004657
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
24717
>
2600 - Land Use Program
>
QX-94-0002
>
SU0004657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:08:55 AM
Creation date
9/4/2019 10:37:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004657
PE
2656
FACILITY_NAME
QX-94-0002
STREET_NUMBER
24717
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LODI
APN
02316002, 03 &
ENTERED_DATE
10/8/2004 12:00:00 AM
SITE_LOCATION
24717 E BRANDT RD
RECEIVED_DATE
10/7/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\24717\QX-94-02\SU0004657\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
within 60 days of assuming supervisory responsibilities. Supervisors will refresh their training <br /> by reviewing this Plan, and any update thereto, at least annually. All training activities shall <br /> be documented and maintained with the Plan for at least five years. Trauung <br /> Documentation forms are included in Appendix E. <br /> h <br /> 5.6 Storm Water Management Practices <br /> h <br /> This section addresses the practices that will be used to manage storm water which may be <br /> affected by contamination sources. <br /> ` 5.6.1ua <br /> Q i'rY <br /> • Storm water holding ponds will retain storm water adjacent to active portions <br /> of the quarry thus preventing flow into previously reclaimed areas, pristine <br />+ areas and/or surface water features. <br /> First cuts associated with excavation of previously urmined areas will be made <br /> such that all affected land will drain back to the active quarry. Such situations <br /> may warrant formation of a perimeter trough around grubbed areas. <br /> Advancement of the quarry highwall will result in drainage back to the active <br /> • Appropriate pumps and personnel will be made available to prevent overflow <br /> of storm runoff from the quarry into drainage courses during exceptionally <br /> large storm events. <br /> 5.6.2 Plant <br /> i <br /> Crushing, washing, and sorting equipment, as well as stockpiles, are located within a:bowl- <br /> shaped depression with surface drainage toward the center of the bowl. Surface drainage <br /> is captured at drop inlets and discharged to the secondary settling pond. The drainage <br /> system is shown schematically in Figure 5. <br /> Maintain open drains, intact perimeter berms, and clean drainage conduits. <br /> I <br /> i <br /> 5.63 Offices and Vehicle Maintenance Area <br /> Maintain integrity of impoundments along northeast edge of area. <br /> • Maintain grade-to-drain clearance. <br /> j f Regularly skim and clean sand/oil trap and properly dispose of associated <br /> wastes. <br /> Storm Water Management P+an-KRC Aggregate Im <br /> 13M Project Na 592104.2 n <br /> i Revised January 19940 <br />
The URL can be used to link to this page
Your browser does not support the video tag.