Laserfiche WebLink
F p <br /> J. Future Minin : Ex lain how the ro osed reclamation of <br /> .this site will affect the <br /> potential for future mining at the site. - Since the land will be reclaimed to <br /> essentially pre-mine,conditions and:no.permanent improvements .are. proposed, <br /> there should be.no_affect on the potential:for Iutuie mining.except that the near- <br /> surface aggregate deposits will have been harvested. <br /> K_ Public Safe : What measures 1O be taken`to .•' " c <br /> ensure public safe, (e,g. fences" <br /> ates'..slo es si or hazard 'removal. ` How will tfie safely measures be <br /> F maintaineO —The`entire site'is fenced and access roads are gated. Warn ng.s' <br /> are plIgns <br /> aced at.various places along;the perimeter of the site and near active mine, <br /> and processing areas. Safe:speed limits are posted,on the mine site-and' . .. <br /> traffic. <br /> speeds are closely monitored. .Speed control bymps are also maintained"along the <br /> main entrance road-and 'around the processing area. <br /> F <br /> k <br /> Distribution Copy Page 14 of 14 August 2, 2006 <br />