My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006291
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
26255
>
2600 - Land Use Program
>
PA-0600277
>
SU0006291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:16 AM
Creation date
9/4/2019 10:37:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006291
PE
2605
FACILITY_NAME
PA-0600277
STREET_NUMBER
26255
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
CLEMENTS
APN
02324001
ENTERED_DATE
10/3/2006 12:00:00 AM
SITE_LOCATION
26255 E BRANDT RD
RECEIVED_DATE
10/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\26255\PA-0600277\SU0006291\APPL.PDF \MIGRATIONS\B\BRANDT\26255\PA-0600277\SU0006291\CDD OK.PDF \MIGRATIONS\B\BRANDT\26255\PA-0600277\SU0006291\EH COND.PDF \MIGRATIONS\B\BRANDT\26255\PA-0600277\SU0006291\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Significant Unavoidable Adverse Impacts <br /> MBA will discuss all significant unavoidable adverse impacts, in conforrriance with-th' State <br /> CEQA Guidelines,.Section 15126 (b). Included in the discussioninriA be.any impacts that` <br /> carr!be.partialiy.mitigated; but not to a level that"is less than significant ;Any.mitigation' <br /> measures considered, but eliminated from suggestion'becaus,e.of.new.i;mpact:s that wo'id ; <br /> p k. <br /> be associated with their implementation' Will also.be discussed. : <br /> Growth=Inducing Impacts <br /> f <br /> Pursuant-to Section 15126 (g) of the State CEQA'Guideliri s, the±ElR.will include a <br /> discussion of potential growth-inducing impacts of.the <br /> project. Potential sources of growth <br /> inducement and their corresponding impacts, such'as removal of obstacles torgrowth, major <br /> new employment generation, or major economic influences_, will be qualitatively analyzed, to <br /> the extend that they are applicable. <br /> Other CEQA Mandated Section" <br /> t <br /> Prepare other CEQA mandated sections of the EIR as folio <br /> ws: <br /> • Table of Contents <br /> • Significant irreversible Environmental Changes <br /> . List of Organizations and Persons Consulted <br /> • Authors of the Environmental Document <br /> • References <br /> • Technical Appendices <br /> All technical reports prepared in conjunction with the Draft EIR will be included as technical <br /> appendices. .Additional reports prepared by the County, but used in the analysis, may also <br /> be attached. <br /> 1.5: Prepare Draft EIR <br /> MBA will respond to the County's comments on the Administrative Draft EIR, complete <br /> necessary revisions, and publish the Draft EIR for public review. Once the product is <br /> determined ready for public distribution, MBA will take responsibility for distribution of the <br /> Draft EIR. <br /> r ' <br /> To facilitate this process, MBA will proceed as outlined below. <br /> 1. Coordinate with the County staff that will assemble comments on, and suggested <br /> revisions to, the Administrative Draft EIR. This proposal assumes that the County <br /> will provide one set of final unified staff comments. <br /> 2. Prepare and reproduce the Draft EIR for submittal to the County for a final proof- <br /> check review.prior to distribution to the public. Submit six (6) copies on CD and six <br /> (6) printed bound copies to County Staff for review. <br /> 3. Produce one hundred (100) hard copies, including one unbound "camera ready" <br /> copy, and ten (10) digital compact disc, web-supportable format of the Draft EIR,. <br /> Based on a distribution list prepared during the NOP process, MBA will distribute up <br /> to 35 copies of the Draft EIR by certified mail to public agencies, the general public, <br /> and other interested parties. MBA will deliver 15 copies of the Draft EIR to the State <br /> Clearinghouse, along with the Notice of Completion (NOC). MBA will prepare the <br /> Notice of Availability (NOA) and Public Notice, but assumes that the County will file <br /> the required local notices (newspaper, County Clerk). The 45-day public and agency <br /> review period will commence once the documents are submitted to the State <br /> l Clearinghouse and made available for public review. <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.