Laserfiche WebLink
i <br /> Project: The SJMSCP covers Incidental Take that occurs in mining areas classified by'' <br /> the Division of Mines and Geology as MRZ-2 zones. Notwithstanding potential venial <br /> pool habitat, which is not currently covered under the'SJMSCp, MBA assumes that' <br /> the extent of the anticipated impacts to biological resources resulting from the project <br /> will be covered under.the SJMSCP or through project-specific measuresahaf provide <br /> in=kind mitigation MBA.assumes that the Applicant will,provide an.y addrtiorial <br /> biological resource reports (e.g. Tiger Salamander'S:urvey) for use-iia the EIR. <br /> • The extent of impacts to "waters of the U. S." or Waters of the.Sta#e" as a result of : <br /> Project-related alterations to onsite ephemeral drainages will qualify for coverage <br /> under a nationwide permit'(:NWP). MBA understands that the Applicant has hired a <br /> consultant to prepare a formal wetland delineation and assumes that this re ort will <br /> be <br /> provided once a draft is available. At this time, however, MBA is unable to confirm <br /> whether the area of disturbance would qualify for a NWP 44 and whether the Applicant <br /> would be required to file for an individual permit. <br /> • MBA assumes that the Applicant will provide a co <br /> recharge stud p Y copy of the groundwater pumping and <br /> 9 y prepared b a Registered Hydrologist as required by the County <br /> Department of Public Works (May 15, 2007)for review and inclusion in the EIR, if <br /> necessary. <br /> • MBA assumes that the Applicant will provide a Project Drainage Plan or equivalent as <br /> required by the County Department of Public Works (May 15, 2007)for review and i <br /> f inclusion in the EIR, if necessary. <br /> * No geotechnical work is proposed as part of this scope of work. MBA assumes that <br /> the Project Applicant will provide all geotechnical reports, geologic exploratory and slope stability studies prepared <br /> in conjunction with the existing and <br /> proposed mining applications to support the proposed slope configuration(s) and <br /> overall EIR analysis. <br /> r <br /> d <br /> ii <br /> i <br /> i <br /> j <br /> P <br />