My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006628
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRIGGS
>
401
>
2600 - Land Use Program
>
PA-0700305
>
SU0006628
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:36 AM
Creation date
9/4/2019 10:38:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006628
PE
2631
FACILITY_NAME
PA-0700305
STREET_NUMBER
401
Direction
W
STREET_NAME
BRIGGS
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19334021
ENTERED_DATE
7/10/2007 12:00:00 AM
SITE_LOCATION
401 W BRIGGS RD
RECEIVED_DATE
7/10/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\B\BRIGGS\401\PA-0700305\SU0006628\APPL.PDF \MIGRATIONS\B\BRIGGS\401\PA-0700305\SU0006628\CDD OK.PDF \MIGRATIONS\B\BRIGGS\401\PA-0700305\SU0006628\EH COND.PDF \MIGRATIONS\B\BRIGGS\401\PA-0700305\SU0006628\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site#:CA301 IMTG <br /> Site Name: Wolf Court <br /> HORIZON MTG , LLC <br /> 140 Town&Country Drive,Ste E <br /> Danville,CA 94256 <br /> 925-314-1113 office <br /> 925-314-1114 fax <br /> Project Description <br /> irrrrrrrrrarrrrrrrrrrrrrrrrrarrrrrrrrrrrrrrrrrerrrrrararrrearrrrrrrrrrrrrrrrrrrrrer■<br /> Site Address: 401 Brigs Ave., Lathrop 95330 <br /> APN: 193-340-21 _ <br /> Horizon MTG, LLC a division of Horizon Tower, LLC is a San Francisco Bay Area based <br /> Tower and Infrastructure Development Company that is primarily focused on developing new tower <br /> infrastructure in the western region of the United States. Horizon Tower is backed by Duff, Ackerman <br /> & Goodrich, ("DAG"), a San Francisco based Private Equity fin that has substantial experience in the <br /> wireless telecommunications industry. We are working to enhance our coverage and network <br /> capabilities in the southwest Stockton area_ The above mentioned location is currently one of our <br /> client's troubled areas due to a hole in their network, leading to dropped calls and a lack of service in <br /> this area. The proposed installation will allow for multiple carriers to provide coverage to this area of <br /> Stockton along I-5 and for future coverage of the southern portion of a planned development area at <br /> Howard road. Horizon MTG is requesting a conditional use to install a wireless communications <br /> facility at APN: 193-340-21. The proposed tower would stand at 120' in height with antennas to be <br /> mounted at a RAD centers of 117', 107', 97', and 87', for an overall height not to exceed 120ft. <br /> The addition of antennas to the tower, will be one (1) array of twelve (12)proposed (4 <br /> antenna per sector with 3 sectors). There will be an additional three (3) future array of antenna at 107ft, <br /> 97ft and 87ft, each will be 12 antennas (4 antennas per sector/3 sectors). The equipment cabinets are <br /> four (4)proposed on a 8 x10 concrete pad. There will be twelve (12) future cabinets on three future <br /> concrete equipment pads in the lease compound. These cabinets will sit on the concrete slabs and will <br /> be connected to the tower by coax cables through the center of the tower and up to the antennas. The <br /> cabinets will be screened from view and enclosed behind a 6' chain link fence and gate with slats. <br /> Construction time of this site will be approximately two weeks and will be coordinated with the <br /> affected parties. During construction and testing, a small microwave dish may be required until such <br /> time as the local telephone provider installs permanent service. After, the initial construction phase, the <br /> site will be visited and maintained by a technician on a once per month basis. These visitations <br /> typically take place during the night hours to minimize impact to aur network. This limited amount of <br /> traffic to the site should not affect the traffic patterns in the area. The proposed project will not utilize <br /> any connection to any water system, refuse collection, or sewer system. The development would not <br /> normally involve any police or fire response to calls for service. The development will not affect any <br /> traffic flow patterns. <br /> The communications site does not emit any odor, dust, gas noise, vibration, smoke, heat or <br /> glare. The Radio Frequency (RF) Emissions from this site are well within the FCC guidelines for a <br /> wireless PCS communications site. <br /> Contact Person: Rick DaCruz— 209-992-1053 or Barry DaCruz 209-992-1134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.