Laserfiche WebLink
,r <br /> 1 <br /> However,no significant additional noise impacts are anticipated since this area was <br /> already designated for public facilities. See appropriate sections of earlier EIR's. <br /> 6. Energy/NaturalResources: <br /> a. Will the project use substantial <br /> amounts of fuel or energy,require <br /> a substantial increase in demand upon <br /> existing sources,or require the <br /> development of new sources of energy? NO <br /> b. Will the project affect the <br /> potential use,extraction, <br /> conservation,or depletion of a <br /> natural resource(other than <br /> agricultural land)? NO <br /> Other sources used: See approriate sections of earlier EIR's. <br /> 7. Hazards: <br /> a. Will the project create a risk of <br /> explosion; release,generate or <br /> store any hazardous substances;or <br />' cause other dangers to public health <br /> and safety? NO <br /> b. Are there any known hazardous <br /> substances located within 500 feet of <br /> the boundaries of this project,if in <br /> an existing or proposed residential <br /> area(this could include possible <br /> groundwater contamination)? NO <br /> C. Will the.project result in <br /> interference with,or need for, <br /> emergency plans? NO <br /> The Mountain House CSD is recommending conditions of a roval for the retention <br /> basin that will require that it be fenced and gated as a safe1y measure during periods <br /> when the basins are filled with stormwater. The basins will also be subject to the <br /> mosquito abatement requirements of the Master Plan. <br /> PAGE 10 <br />