My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004566
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BYRON
>
0
>
2600 - Land Use Program
>
GP-00-10
>
SU0004566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 9:19:57 AM
Creation date
9/4/2019 10:47:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004566
FACILITY_NAME
GP-00-10
STREET_NUMBER
0
Direction
N
STREET_NAME
BYRON
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
7/21/2004 12:00:00 AM
SITE_LOCATION
N BYRON RD
RECEIVED_DATE
7/26/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\B\BYRON\0\GP-00-10_MP-00-2\SU0004566\EH TRACK LOG.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. n <br /> ,E <br /> Other sources used: See app ro riate sections of earlier EIRs. Also the San Joaquin <br /> County Office of Emer�g_ency Services has completed preparation of an Emer eg ncX <br /> t Operations Plan,in compliance with the Master Plan This emergency plan contains <br /> a detailed emergency preparedness and response°prog_ram for all natural disasters <br /> including earthquakes,rail,pipeline,and hazardous spills,as specified in the Master <br /> Plan. <br /> r <br /> 8. Utilities and Public Service: <br /> i <br /> a. Will the proj ect require alteration of, <br /> addition to,or the need for new utility <br /> systems(water,sewer,drainage,solid <br /> waste),including a Sphere of Influence <br /> or district boundary change? NO <br /> b. Will the project result in the <br /> need for or the expansion of the <br /> following services: fire and police <br /> protection,schools,parks and <br /> recreation,libraries,roads,flood <br /> control,solid waste or other public <br /> works facilities,public transit,or <br /> f governmental services? NO <br /> One high school site is being removed from the Master Plan based on the October <br /> x 27, 1998, School Facilities Impact Mitigation Agreement. Thea reement states in <br /> part"The Master Plan is estimated to generate 4pproximately approximately2,343 high school <br /> students. Based upon this estimate the District has concluded that it will need one <br /> additional high school to house the students generated by the Master Plan." This <br /> High School is located in the central area of Mountain House at the corner of Mascot <br /> Blvd. and Central Parkway. 7'he relocation of the permanent fire station location <br /> will not affect fire protection services. <br /> C. Will the project adversely impact <br /> Gexisting recreational/park <br /> opportunities or require new <br /> park/recreation opportunities NO <br /> f The retention basins will be inte rated into the Mountain House Creek Community <br /> Park and the Old River Regional Park as recreational amenities. The Mountain <br /> House CSD is recon mendins,conditions of a roval for the large retention basin <br /> along Mountain House Creek that will require that its design be consistent with the <br /> character of the Mountain House Creek Communis Park. <br /> Other sources used: See appro hate sections of earlier EIRs. It is pertinent to re eat <br />` here that the"proi get"being evaluated in this initial study are amendments to plans <br /> that were subject to a tier of EIRs. These EIRs identified potentially significant <br />' PAGE I1 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.