My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012885
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CANEPA
>
8721
>
2600 - Land Use Program
>
SU-92-15
>
SU0012885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 4:51:22 PM
Creation date
9/4/2019 10:53:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012885
PE
2611
FACILITY_NAME
SU-92-15
STREET_NUMBER
8721
Direction
N
STREET_NAME
CANEPA
STREET_TYPE
RD
City
STOCKTON
Zip
95212-
APN
08640008
ENTERED_DATE
1/14/2020 12:00:00 AM
SITE_LOCATION
8721 N CANEPA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\C\CANEPA\8721\SU-92-15_SU-87-21\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> TABLE 3 <br /> E PROJECT TRIP GENERATION , <br /> Project Components : <br /> p <br /> 36 single-family dwelling units* <br /> Project Rates : <br /> 10 daily trips/dwelling unit <br /> 10% AM and PM peak hour rates <br /> Net trips : <br /> 36 bU ' s x 10 trips/unit <br /> = 360 daily trips <br /> 10% Am peak hour rate <br /> 40** AM peak hour trips ( 15 in, 25 out) <br /> 1U PH peak hour rate <br /> 40** peak hour trips (25 in, 15 out) <br /> *This figure excludes 3 existing dwelling units which would be <br /> incorporated into the proposed subdivision. <br /> *Peak hour trips rounded to nearest five. <br /> As shown in Table 3, the proposed project would generate <br /> approximately 360 daily trips with 40 trips during AM and PM peak <br /> hours. <br /> 4 . Distribution <br /> Existing traffic flows were examined in order to develop <br /> vehicle distribution . In addition, previous traffic studies <br /> completed in the project study area were examined for vehicle <br /> distribution . 5 Consideration has been given to project access <br /> points as well as project site location with respect to other <br /> intersections in the area . Based on these factors, the proposed <br /> project ' s AM and PM peak hour trips have been distributed on the <br /> surrounding street network and are shown in Figures 7 and 8 . <br /> a. Intersection Operation with Project �+ <br /> Existing intersection LOS for the AM and PM peak hours would <br /> 0 <br /> remain unchanged with the addition of project traffic (see Table <br /> 4 ) . Signal warrants would continue to be met at the intersection <br /> of West Frontage/Hammer. <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.