Laserfiche WebLink
d <br /> g. ACCESS AND CIRCULATION: The following requirements apply and shall be shown on the Site <br /> Plan: <br /> (1) Access driveways shall have a width of no less than twenty-five (25)feet for two-way aisles and <br /> sixteen (16) feet for one-way aisles, except that in no case shall driveways designated as fire <br /> department access be less than twenty feet (20) wide. (Development Title Section 9 <br /> 1015.5[h][1]) <br /> h. LIGHTING: Lighting shall be provided and comply with the following: <br /> (1) If the parking area is to be used at night, parking lot and security lighting shall be installed. <br /> (Development Title Section 9-1015.5[g]) <br /> (2) Any lighting shall be designed to confine direct rays to the premises. No spillover beyond the <br /> property lines shall be permitted except onto public thoroughfares, provided, however, that such <br /> light shall hot cause a hazard to motorists. (Development Title Section 9-1015.5[g][4]) <br /> i. SIGNS: Sign details shall be consistent with Chapter-9-1710 of the Development Title and be <br /> included on the Site Plan. All portions of any sign shall be set back a minimum of five (5) feet from <br /> any future right-of-way line, including any corner cut-off (snipe). (Development Title Section 9- <br /> j 1710.2[gj) , <br /> BUILDING CODE REQUIREMENTS: The following Uniform Building Code and San Joaquin <br /> County Ordinance requirements will be applicable and shall be incorporated in the construction plans <br /> before submittal to the Building Inspection Division: <br /> [ (1) Provide restrooms conforming with all disabled access requirements(C.C.R.,Title 24). <br /> 2. DEPARTMENT OF PUBLIC WORKS: (Staff Contact: Michael Callahan, 468-3000) <br /> a. An encroachment permit shall be required for work within the road right-of-way. (Development Title <br /> Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br /> c. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee currently is$187.15 per additional daily trip-end <br /> generated in the Lathrop area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution <br /> 00-433) <br /> d. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee shall be based on the current schedule (R-06-38). <br /> e. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> 1, f. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> i met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> Sart Joaquin County PA-05007261Sanchez <br /> III Community Development Page 8 <br /> i <br />