Laserfiche WebLink
u SANJOQQUIN COMMUNITY DEVELOPMENT DEPARTMENT <br /> SITE APPROVAL <br /> —COUNTY— <br /> Greatness <br /> OUNTYGreatness grows here. <br /> FILE NUMBER: <br /> PERFORMANCESTANDARDS <br /> (Attach additional sheets as necessary) <br /> See Chapter 9-1025 of the Development Title for Performance Standard Regulations <br /> Air Quality <br /> Describe air pollutants that may result from the project including during construction: <br /> No major air pollutants. Minor grading and groundwork during construction may create dust,which will be controlled by <br /> water and/or dust suppressants. <br /> Noise <br /> Describe on-site sources of noise or vibration that may result from the proposedproject: <br /> Some equipment including inverters and HVAC units will produce noise. A similar energy storage project being developed in <br /> San Diego county was simulated to have a maximum noise level of 65 dBA at the property line with a minimum distance from <br /> equipment at 20 feet. <br /> Describe any machinery, equipment, or transportation noise that may result from the proposed project: <br /> During the construction period of 9 months,equipment would be shipped to the site via trucks which would produce intermittent noise <br /> during daytime hours(7 AM -6 PM). <br /> IL — <br /> Light and Glare <br /> Describe any on-site sources of light and/or glare that may result from the proposed project: <br /> Minimal light at the site. Some motion activiated lights with on/off switches will be installed for safety purposes. <br /> Lighting would bedirected downwards towards the project facilities to limit area light pollution. <br /> Odor <br /> Describe any on-site source of odor that may result from the proposed project: <br /> The proposed project is not anticipated to emit an odor. <br /> Page 5 of 6 <br /> Updated 04/29/2019 <br />