My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012380
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
2482
>
2600 - Land Use Program
>
PA-1900132
>
SU0012380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2020 8:13:43 AM
Creation date
9/4/2019 10:55:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012380
PE
2631
FACILITY_NAME
PA-1900132
STREET_NUMBER
2482
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95205-
APN
17914018
ENTERED_DATE
6/19/2019 12:00:00 AM
SITE_LOCATION
2482 E CARPENTER RD
RECEIVED_DATE
6/24/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\C\CARPENTER\2482\PA-1900132\SU0012380\APPL.PDF \MIGRATIONS\C\CARPENTER\2482\PA-1900132\SU0012380\CDD OK.PDF \MIGRATIONS\C\CARPENTER\2482\PA-1900132\SU0012380\EH COND.PDF \MIGRATIONS\C\CARPENTER\2482\PA-1900132\SU0012380\PROJECT DESCRIPTION.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u SANJOQQUIN COMMUNITY DEVELOPMENT DEPARTMENT <br /> SITE APPROVAL <br /> —COUNTY— <br /> Greatness <br /> OUNTYGreatness grows here. <br /> FILE NUMBER: <br /> PERFORMANCESTANDARDS <br /> (Attach additional sheets as necessary) <br /> See Chapter 9-1025 of the Development Title for Performance Standard Regulations <br /> Air Quality <br /> Describe air pollutants that may result from the project including during construction: <br /> No major air pollutants. Minor grading and groundwork during construction may create dust,which will be controlled by <br /> water and/or dust suppressants. <br /> Noise <br /> Describe on-site sources of noise or vibration that may result from the proposedproject: <br /> Some equipment including inverters and HVAC units will produce noise. A similar energy storage project being developed in <br /> San Diego county was simulated to have a maximum noise level of 65 dBA at the property line with a minimum distance from <br /> equipment at 20 feet. <br /> Describe any machinery, equipment, or transportation noise that may result from the proposed project: <br /> During the construction period of 9 months,equipment would be shipped to the site via trucks which would produce intermittent noise <br /> during daytime hours(7 AM -6 PM). <br /> IL — <br /> Light and Glare <br /> Describe any on-site sources of light and/or glare that may result from the proposed project: <br /> Minimal light at the site. Some motion activiated lights with on/off switches will be installed for safety purposes. <br /> Lighting would bedirected downwards towards the project facilities to limit area light pollution. <br /> Odor <br /> Describe any on-site source of odor that may result from the proposed project: <br /> The proposed project is not anticipated to emit an odor. <br /> Page 5 of 6 <br /> Updated 04/29/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.