My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012896
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
3563
>
2600 - Land Use Program
>
SU-97-1
>
SU0012896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 10:44:42 AM
Creation date
9/4/2019 10:56:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012896
PE
2611
FACILITY_NAME
SU-97-1
STREET_NUMBER
3563
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
17908257
ENTERED_DATE
1/15/2020 12:00:00 AM
SITE_LOCATION
3563 E CARPENTER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\C\CARPENTER\3563\SU-97-1\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SU-97-1 <br /> 2 . If improvements referred to herein are not completed prior to the <br /> approval of the Final Map, the subdivider shall execute an agreement <br /> with the County of San Joaquin ensuring the completion of improvements <br /> within one (1) year after filing the Final Map. <br /> p (Development Title Section 9-1100 .3) <br /> 3 . Agua Bonita Drive, Fontinalis Street, Glenda Circle and Glenda Drive <br /> shall be dedicated and improved to County Standards for a 50-foot <br /> right-of-way local residential street. <br /> (Development Title Sections 9-857 .4, 9-1150 .2 (d) (3) and 9-1150 . 5 (b) ) <br /> 4 . Dedication to result in a 60-foot wide right-of-way from the <br /> centerline of Carpenter Road to the property line shall be required <br /> and improved on the subdivided side to County Standards for a 60 foot <br /> right-of-way collector residential street . <br /> (Development Title Section 9-1150 .5 (b) ) <br /> S . A community retention pond or detention pond/terminal drainage system <br /> shall be provided to meet the requirements of the County and to <br /> provide adequate drainage for the subdivision. <br /> (Development Title Section 9-1135 .2) <br /> 6 . The project shall be served by a public water system conforming to the <br /> requirements of the San Joaquin County Public Health Services <br /> Environmental Services Division, and the Department of Public Works. <br /> A "Will Serve" letter from the California Water Services Company shall <br /> be required. <br /> (Development Title Section 9-1120 . 2) <br /> 7 . The project shall be served by a public sewer collection system <br /> constructed in conformance with the requirements of the San Joaquin <br /> County Public Health Services Environmental Services Division, the <br /> Department of Public works and the City of Stockton. A "Will Serve" <br /> letter from the City of Stockton shall be required. <br /> (Development Title Section 9-1105 . 2) <br /> 8 . Street lighting shall be provided for the subdivision and the frontage <br /> of Carpenter Road. <br /> (Development Title Section 9-1150 . 11) <br /> 9 . A County Service Area shall be formed prior to the approval of the <br /> Final Map to provide for the operation, maintenance and improvement of <br /> storm drainage, and street lighting facilities . <br /> (Development Title Section 9-1100 .4) <br /> 10 . Adjustment to improvements shall be made to provide for two-way <br /> traffic and for temporary cul-de-sacs as well as utility systems <br /> modification to conform to County Standards where subdivision is to be <br /> recorded in phases . <br /> 11 . A Preliminary Soils Report is required in accordance with the County <br /> Standards for the purpose of determining the R-Value for the design of <br /> the roads . <br /> (Development Title Section 9-910 .2) <br /> 12 . All utilities shall be underground except power transmission <br /> facilities of a 35 KV or greater. Public utility easements shall be <br /> provided along the road frontage of the subdivision and as required by <br /> the public utility companies . <br /> (Development Title Section 9-1155 .2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.