Laserfiche WebLink
aid Fomrer Fue ft Station-7500 W. 11 th St., Tracy,CA <br /> ENGINEER'S ESTIMATE FOR <br /> REFINED PLUME DEFINITION AND MANAGEMENT OF FLOATING PRODUCT <br /> Technology C-Extraction of Floating Product from Extraction Wells Skimmer Pumps <br /> and Discharge Into On-Site Holding Tank <br /> Capital cost <br /> (Including final engineering design,engineering oversight of construction,preparation of operating and maintenance manuals, <br /> i" one month commissioning and operating cost and prorated LNAPL disposal cost.) <br /> Item No. Units Unit Rab Extension <br /> too <br /> S ; <br /> Senior Engineer 40 Hours 90.00 3,600.00 <br /> Assistant Engineer 140 Hours 75.00 10,500,00 <br /> Field Technician 64 Hours 40.00 2,560.00 <br /> Technician 24 Hour 40.00 960.00 <br /> Draftsman 40 Hour 40.00 1,600.00 <br /> Word Processor 24 Hour 35.00 840.00 <br /> ► Field Vehicle 30 Day 35.00 1,050.00 <br /> Groundwater Level Meter 15 Day 25.00 375.00 <br /> LNAPL/Groundwater Interface Probe 15 Days 100.00 1,500.00 <br /> 4 TPH(d)in Soli 15 No. 50.00 750.00 <br /> �4r TPH(g)and BTEX Soil 15 No. 65.00 975.00 <br /> GeoTracker Electronic Fib 3 No. 3.00 9.00 <br /> 4 <br /> 4 <br /> Installation Costs(See attached sheet) 1. Lot 78,559.17 78,559.17 <br /> Ebcl6city 4000 KwH 0.15 580.00 <br /> LNAPL Transports and Disposal 840 gal. 3.00 2,520.00 <br /> (Prorated over first six months) <br /> Operating Manual Reproduction 10 No. 35.00 350.00 <br /> Y� Miscellaneous Expenses 1 Lot 500,00 540.D0 <br /> 15%of Engineers Direct Costs i Lot 127.50 127.50 <br /> ,4. total Capital Cost-Technology C 107,355.67 <br /> Monthly Operating Cost <br /> im (Including system operation and maintenance,prorated off-site LNAPL disposal and technical reporting.) <br /> Item No. Units Unit Rate Extension <br /> Senior Engineer 0.5 Hours 90.00 45.00 <br /> Assistant Engineer 4 Hour 75.00 300.00 <br /> j <br /> Page 1 of 3 sic <br />