Laserfiche WebLink
Former FueNng Sfafiton-7500 W. 1 Jfh St.. Tracy,CA <br /> Item No. Units Unit Rate Extension <br /> $ ; <br /> Heid Technician 20 Hours 40.00 800.00 <br /> i <br /> Technician 4 Hours 40.00 180.00 <br /> Word Prooessor 1 Hours 35.00 35.00 <br /> 16W Field Vehicle 4 Day 30.00 120.00 <br /> Groundwater Depth Meter 4 Day 15.00 60.00 <br /> 4+ LNAPLIGroundwater Interface Probe 4 Day 50.00 200.00 <br /> Miscellaneous.Expenses 1 No. 100.00 100.00 <br /> Electricity 4000 KwH 0.15 580.00 <br /> LNAPL Transport and Disposal 500.00 gal. 3.00 11500.00 <br /> (Prorated over 2.5 years) <br /> Miscellaneous Expenses 1 Lot 18.00 18.00 <br /> 15%of Engineer's Direct Costs 1 Lot 30.00 30.00 <br /> Total Monthly Operating Cost-Technology C 3.948.00 <br /> System Closure Cost <br /> Item No. Unite Unit Rah Extension <br /> S = <br /> %W General Contactors Mobilization 1 Lot 500.00 500.00 <br /> �r <br /> Drilling Contactors Mobilization 1 Lot 350.00 350.00 <br /> Assistant Engineer 12 Hours 75.00 900.00 <br /> Field Technician 8 Hours 40.00 320.00 <br /> Technician 2 Hours 40.00 80.00 <br /> Word Process" 1 Hours 35.00 35.00 <br /> Field Vehkje 1 Day 35.00 35.00 <br /> i <br /> Groundwater Level Meter 1 Day 25.00 25.00 <br /> Submersible Pump 1 Day 25.00 25.00 <br /> it pHlrempJConducdvhy Meter 1 Day 50.00 50.00 <br /> Disposable Baller 3 No. 2.50 7.50 <br /> TPH(d)in Water with EPA Method 3630M Cleanup 3 No. 90.00 270.00 <br /> TPH(g),STEX,Fuel Oxyg.,EDB and EDC In Water 3 No. 150.00 450.00 <br /> GeoTracker Electronic File 3 No. 3.00 9.00 <br /> Dispose of Purge Water 175.00 Gal 3.00 525.00 <br /> Daraolitlon Including Disposal of Construction Debris 1 Lot 5000.00 5000.00 <br /> 'a.. <br /> Page 2 of 3 sic <br /> L <br />