My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011751
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7500
>
3500 - Local Oversight Program
>
PR0544801
>
ARCHIVED REPORTS XR0011751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:08 AM
Creation date
9/4/2019 11:03:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011751
RECORD_ID
PR0544801
PE
3528
FACILITY_ID
FA0003210
FACILITY_NAME
TEXACO TRUCK STOP
STREET_NUMBER
7500
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25015018
CURRENT_STATUS
02
SITE_LOCATION
7500 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•+ Work Plan for Refined Plume Definition and Management of bating Product-7500 W 11th A, Tracy, CA. Page i <br /> -R Table of Contents <br /> PROFESSIONAL CERTIFICATION AND LIMITATIONS..................................................v <br /> �.. 1.0 INTRODUCTION...........................................................................................................................1 <br /> 1.1 Site Location...............................................................................................................................1 <br /> 1.2 Site Codes...................................................................................................................................1 <br /> .r 2.0 BACKGROUND......................................................................................................................... ..2 <br /> 2.1 Ownership History of Site and Fueling Station..........................................................................2 <br /> 2.2 Removal of Underground Fuel Storage Tanks...........................................................................2 <br /> 2.3 Completed Phases of Soil Remediation and Floating Product Removal....................................2 <br /> 2.4 Interim Measures for Removal of LNAPL from Area around MW-7....................... <br /> 3.0 GEOLOGY AND HYDROGEOLOGY..........................................................................................4 <br /> 4.0 Site Characterization and Groundwater-quality Monitoring...........................................................6 <br /> 4.1 Initial Site Characterization ....6 <br /> .................................................................................................... <br /> 4.2 Initial Quarterly Groundwater-quality Monitoring Program......................................................7 <br /> 4.3 Extended Site Characterization .......................................•-•----....................................................8 <br /> 4.4 Extended Quarterly Groundwater-quality Monitoring Program................................................8 <br /> 4.5 Annual, Semi-annual and Quarterly Groundwater-quality Monitoring Program.......................9 <br /> 4.6 Potable Water Supply Wells.......................................................................................................9 <br /> 4.7 Summary of Completed Characterization and Monitoring Programs......................................10 <br /> 5.0 Down-gradient Migration of Floating Product..............................................................................12 <br /> 5.1 Initial Proposals for Removal of Floating Product...................................................................12 <br /> 5.2 Estimates of Thickness and Volume of LNAPL in Subsurface...............................................13 <br /> 5.2.1 Thickness of Floating Product..........................................................................................14 <br /> 5.2.2 Recoverable Floating Product ...14 <br /> 5.2.3 Area of Subsurface Affected by Floating Product...........................................................15 <br /> 5.2.4 Volume Estimate for Engineering Design Purposes ....17 <br /> .................................................... <br /> 5.2.4.1 Total Volume..................................................................................... .....17 <br /> 5.2.4.2 Recoverable Volume.........................................................................................•---...17 <br /> 6.0 PROPOSED GROUNDWATER-QUALITY MONITORING IN DOMESTIC WELLS............19 <br /> 6.1 Schedule ...................................................................................................................................20 <br /> 6.2 Cost Estimate........................................................•-•-------•.........................................................21 <br /> ••� 7.0 ADDITIONAL MONITORING WELLS TO REFINE PLUME DEFINITION..........................22 <br /> 7.1 Proposed Wells.........................................................................................................................22 <br /> 7.2 Well Drilling and Soil Sampling..............................................................................................23 <br /> 7.3 Disposal of Drill Cuttings.........................................................................................................24 <br /> 7.4 Well Design....................................................................................... .....25 <br /> 7.5 Well Development....................................................................................................................25 <br /> W <br /> 7.6 Survey of Well-head Locations and Elevations........................................................................25 <br /> 7.7 Groundwater-quality Monitoring ........................................................... .....25 <br /> ............................. <br /> 7.7.1 Determination of Groundwater Elevations.......................................................................25 <br /> 7.7.2 Well Purging....................................................................................................................26 <br /> '4 7.7.3 Groundwater Sampling Procedure ........26 <br /> ........................................................................... <br /> 7.7.4 Groundwater Sample Analyses........................................................................................26 <br /> 7.7.5 Disposal of Purge Water...................................................................................................27 <br /> 7.8 Field Modification......................................................................... .... -----.........27 <br /> 7.9 Schedule ...................................................................................................................................27 <br /> 7.10 Cost Estimate..................................................................................... ...28 <br /> ................................... <br /> sic <br />
The URL can be used to link to this page
Your browser does not support the video tag.