Laserfiche WebLink
Work Plan for Refined Plume Definition and Management of Floating Product-7500 W 11th St., Tracy, CA. Page ii <br /> 10N" 8.0 INVESTIGATION OF EXTENT OF FLOATING PRODUCT...................................................30 <br /> 8.1 Floating Product Monitoring Well Array.................................................................................30 <br /> 8.2 Well Drilling and Soil Sampling..............................................................................................31 <br /> 8.3 Disposal of Drill Cuttings.........................................................................................................32 <br /> 8.4 Well Design......................................................................................................... ...33 <br /> .................. <br /> 8.5 Well Development................................................................•--.................................................33 <br /> 8.6 Survey of Well-head Locations and Elevations........................................................................33 <br /> 8.7 Field Modification ..............•.•33 <br /> ................................................................................................... <br /> 8.8 Groundwater Elevations and Measurement of Thickness of Floating Product........................34 <br /> 8.9 Schedule ...................................................................................................................................34 <br /> *• 8.10 Cost Estimate...........................................................................................................................34 <br /> 9.0 PROGRAM FOR MANAGEMENT OF FLOATING PRODUCT..............................................35 <br /> 9.1 Floating Product Managed During Tank Removal...................................................................35 <br /> 9.2 Interim Measures to Manage Floating Product in Area of Monitoring Well MW-7.............:..35 <br /> 9.2.1 Procedure for Measurement of the Thickness of Floating Product..................................35 <br /> 9.2.2 Pump Apparatus and Pumping Technique.......................................................................36 <br /> z. 9.2.3 Post-pumping Procedures.................................................................................................37 <br /> 9.2.4 Floating Product Removed to Date..................................................................................37 <br /> 9.2.5 Cost of Interim Measures.................................................................................................39 <br /> 9.3 Hydrogeologic and Engineering Design Issues Related to LNAPL Remediation ...................39 <br /> 9.3.1 Zone of Influence and Groundwater Drawdown Gradient...............................................39 <br /> 9.3.1.1 Dual Floating Product Extraction/Groundwater Draw-down Systems....................40 <br /> 9.3.2 Representative Elementary Volume.................................................................................41 <br /> 9.3.3 Well Diameter, Excavation Dimensions and Construction Method Considerations........43 <br /> 9.3.3.1 Influence of Well or Excavation Size on Effectiveness of Extraction Systems.......43 <br /> 9.3.3.2 Effect of Construction Method on Well and Excavation Hydraulic Efficiency.......44 <br /> 9.3.4 Scale of System Required for Successful Removal of All Recoverable LNAPL ............45 <br /> 9.3.5 U.S. Environmental Protection Agency Recommendation..............................................46 <br /> 9.4 Floating Product Remediation Technologies Considered........................................................47 <br /> 9.4.1 Technology A—Cut-off Trench and High-volume Pumping of LNAPL .......................48 <br /> 9.4.1.1 Trench Location and Dimensions............................................................................49 <br /> 9.4.1.2 Trenching Technique ...............................................................................................50 <br /> ,,. 9.4.1.3 Soil Sampling in Cut-off Trench..............................................................................51 <br /> 9.4.1.3.1 Analysis of Soil from Trench Bottom and Wails...............................................51 <br /> 9.4.1.4 High-volume Extraction of Floating Product...........................................................52 <br /> 9.4.1.4.1 Bulk Extraction of Contaminated Groundwater.................................................53 <br /> 9.4.1.5 Placement of Permeable Crushed Rock into Cut-off Trench...................................53 <br /> 9.4.1.6 Disposal of Soil Excavated from Cut-off Trench.....................................................54 <br /> 9.4.1.7 Restoration of Site........................................................................... ...........55 <br /> 9.4.1.8 Schedule ......56 <br /> 9.4.1.9 Estimated Cost.........................................................................................................57 <br /> 9.4.1.10 Advantages and Disadvantages...............................................................................58 <br /> 9.4.2 Technology B—Pumping of LNAPL from Extraction Wells into Vacuum Trucks........60 <br /> 9.4.2.1 Extraction Well Installation---•.................................................................................60 <br /> 9.4.2.2 Measurement of Depth to Groundwater and Thickness of Floating Product...........60 <br /> 9.4.2.3 Vacuum Extraction of LNAPL ................................................................................61 <br /> 9.4.2.4 Additional Extraction Points....................................................................................63 <br /> 9.4.2.5 Schedule.....................................................................•.............................................63 <br /> �. 9.4.2.6 Estimated Cost.........................................................................................................64 <br /> 9.4.2.7 Advantages and Disadvantages................................................................................65 <br /> sic <br />