Laserfiche WebLink
.� Work Plan for Refined Plume Definition and Management of Floating Product-7500 W 1111;St., Tracy, CSI. Page iii <br /> 9.4.3 Technology C---Skimming of LNAPL from Extraction Wells........................................67 <br /> y.r 9.4.3.1 Pneumatic Skimmer Pump and Holding Tank System............................................67 <br /> 9.4.3.2 Surface Equipment Enclosure................ ,.,..,69 <br /> ............................................................ <br /> 9.4.3.3 Air and Discharge Line Conduits.......................:.....................................................70 <br /> 9.4.3.4 Noise Reduction Housing ..70 <br /> ...................................................................................... <br /> 9.4.3.5 Electrical Power Supply...........................................................................................70 <br /> 9.4.3.6 System Operation and Maintenance.........................................................................71 <br /> 9.4.3.7 System Shut Down.......................... ...71 <br /> ...................................................................... <br /> 9.4.3.8 ScheduIe...................................................................................................................72 <br /> 9.4.3.9 Estimated Cost: ........................................................................................................73 <br /> iLW 9.4.3.10 Advantages and Disadvantages...............................................................................74 <br /> 9.5 Recommended Floating Product Removal Technology...........................................................76 <br /> 10.0 WELL CLOSURES......................................................................................................................77 <br /> �,. 10.1 Well Closure Procedure..........................................................................................................77 <br /> 10.2 Proposed Closure of Existing Wells.......................................................................................77 <br /> 10.2.1 Schedule................................................................................. ...79 <br /> ..................................... <br /> 10.2.2 Cost Estimate..................................................................................................................79 <br /> 11.0 UNDERGROUND UTILITY LOCATION AND PERMITTING...............................................80 <br /> 11.1 Detection of Underground Utilities........................................................................................80 <br /> 11.2 Permitting....................................................................................................... ..................80 <br /> 12.0 PROJECT-SPECIFIC HEALTH AND SAFETY PLAN.............................................................81 <br /> .................................... <br /> 13.0 REPORTS.....................................................................................................................................82 <br /> 13.1 Engineering Reports...............................................................................................................82 <br /> 13.2 Information Reports to State Agencies.................. <br /> 13.2.1 Well Completion and Destruction Reports....................................................................82 <br /> 13.2.2 Electronic Report to the California State Water Resources Control Board....................82 <br /> 4+` 14.0 SITE CLOSURE...........................................................................................................................84 <br /> 14.1 Estimated Cost.............. .. 84 <br /> ................ ........................................................................................ <br /> 15.0 PROJECT SCHEDULE................................................................................................................85 <br /> 16.0 REFERENCES .............................................................................................................................86 <br /> TABLES <br /> Table 1: Depth to Groundwater <br /> Table 2: Results of Analyses of Samples of Groundwater <br /> Table 3: Thickness of Floating Product in Monitoring Well MW-7 <br /> Table 4: Wells in Neighborhood of 7500 West Eleventh Street Site <br /> FIGURES <br /> w <br /> Figure 1: Site Location <br /> Figure 2: Site Plan <br /> 1« Figure 3: Tank Pit and Pipe Trench Locations <br /> Figure 4: Plume of Affected Groundwater with Existing and Proposed Wells <br /> Figure 5: Affected Soil in Cross Section A-A' <br /> ,., Figure 6: Affected Soil in Cross Section B-B' <br /> Figure 7: Affected Soil in Cross Section C-C' <br /> Figure 8: Groundwater-quality Monitoring Well <br /> ... Figure 9: Locations of Floating Product Monitoring Wells <br /> Figure 10: Floating Product Monitoring Well <br /> Figure 11: Technology A-Floating Product Extraction Trench Location <br /> sic <br />