Laserfiche WebLink
Conditions <br /> Site Approval Application No. PA-1500200 was approved by the Community Development <br /> Department on .The effective date of approval is . This approval will expire on ,which is 18 months <br /> from the effective date of approval, unless(1) all Conditions of Approval have been complied with, (2) <br /> all necessary building permits have been issued and remain in force, and(3) all necessary permits <br /> from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approvai and ordinance requirements shat! be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been- identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Contact Staff: Megan Aguirre, [209)468-3144) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST'for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an existing poultry egg farm from 300,000 <br /> birds to 700,000 birds and from 3.47,711 square feet to 434,716 square feet in five (5) phases <br /> over nine (9) years as shown on the revised Site Plan dated August 10, 2018. (Use Type: Animal <br /> Raising—Small Animals) <br /> • Phase 1, with the building permits to be issued within eighteen (18) months from the effective <br /> date of approval, includes the addition of 100,000 birds and the demolition of 86,760 square <br /> feet of buildings. <br /> • Phase 2, with the building permits to be issued within three(3) years, includes the construction <br /> of a 17,370 square foot manure drying tunnel. <br /> • Phase 3, with the building permits to be issued within five (5) years, includes the addition of <br /> 150,00-0 birds and the construction of a 60,770 square foot layer house with a manure drying <br /> tunnel. <br /> • Phase 4, with the building permits to be issued within seven (7) years, includes the addition of <br /> 150,000 birds and the construction of a 46,350 square foot layer house addition. <br /> • Phase 5, with the building permits to-be issued within nine (9) years, includes the infill of the <br /> existing pond, the construction of a 2,775 square foot packing and cold storage_building, and <br /> the addition of three (3) manure drying tunnels to existing layer houses. Each manure drying <br /> tunnel to contain 15,500 square feet. <br /> These Conditions of Approval supercede the Conditions of Approval for Site Approval application No. <br /> SA-92-0073. <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> San Joaquin County PA-1500200/Jenkins <br /> Community Development Page 10 <br />