My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011784
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CARTER
>
30636
>
2600 - Land Use Program
>
PA-1500200
>
SU0011784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:25 AM
Creation date
9/4/2019 11:04:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011784
PE
2633
FACILITY_NAME
PA-1500200
STREET_NUMBER
30636
Direction
E
STREET_NAME
CARTER
STREET_TYPE
RD
City
ESCALON
Zip
95230-
APN
20708004
ENTERED_DATE
5/1/2018 12:00:00 AM
SITE_LOCATION
30636 E CARTER RD
RECEIVED_DATE
5/1/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\C\CARTER\30636\PA-1500200\SU0011784\APPL.PDF \MIGRATIONS\C\CARTER\30636\PA-1500200\SU0011784\EH PERM.PDF \MIGRATIONS\C\CARTER\30636\PA-1500200\SU0011784\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions <br /> Site Approval Application No. PA-1500200 was approved by the Community Development <br /> Department on .The effective date of approval is . This approval will expire on ,which is 18 months <br /> from the effective date of approval, unless(1) all Conditions of Approval have been complied with, (2) <br /> all necessary building permits have been issued and remain in force, and(3) all necessary permits <br /> from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approvai and ordinance requirements shat! be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been- identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Contact Staff: Megan Aguirre, [209)468-3144) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST'for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an existing poultry egg farm from 300,000 <br /> birds to 700,000 birds and from 3.47,711 square feet to 434,716 square feet in five (5) phases <br /> over nine (9) years as shown on the revised Site Plan dated August 10, 2018. (Use Type: Animal <br /> Raising—Small Animals) <br /> • Phase 1, with the building permits to be issued within eighteen (18) months from the effective <br /> date of approval, includes the addition of 100,000 birds and the demolition of 86,760 square <br /> feet of buildings. <br /> • Phase 2, with the building permits to be issued within three(3) years, includes the construction <br /> of a 17,370 square foot manure drying tunnel. <br /> • Phase 3, with the building permits to be issued within five (5) years, includes the addition of <br /> 150,00-0 birds and the construction of a 60,770 square foot layer house with a manure drying <br /> tunnel. <br /> • Phase 4, with the building permits to be issued within seven (7) years, includes the addition of <br /> 150,000 birds and the construction of a 46,350 square foot layer house addition. <br /> • Phase 5, with the building permits to-be issued within nine (9) years, includes the infill of the <br /> existing pond, the construction of a 2,775 square foot packing and cold storage_building, and <br /> the addition of three (3) manure drying tunnels to existing layer houses. Each manure drying <br /> tunnel to contain 15,500 square feet. <br /> These Conditions of Approval supercede the Conditions of Approval for Site Approval application No. <br /> SA-92-0073. <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> San Joaquin County PA-1500200/Jenkins <br /> Community Development Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.