Laserfiche WebLink
i <br /> E <br /> i. -Interior roads.shail be.named and dedicated and improved to County standards for a 50=foot wide ' <br /> right-of way local residential road.with vertical curb and gutter: Sidewalks-are not`required. <br /> (Peveloprrment Title Sectioh9-11.50' b]) <br /> j. Dedication to result m a 42 foot=wide right-of-way from the centerline of Cf risman`-Road'to the <br /> property tine shall,be required:;Dedication=shall be made on the final Map: {DeveloprrientTitle` <br /> ;Section 9-11:50.5[bj) <br /> „k The frontage improvements for Chrisman Road shall be constructed fn b",formai ce with";the <br /> standards for one-half of.an 84=foot wide right-of-way Minor,Arterial:' The,developer rnay;request a ,'. <br /> five=year secured deferred 44: 16 The construction of the frontage improvements'; <br /> will be deterred upon execut�on`of a Secured.Deferred'Fr6n6t a acid Roadway lhiprovement <br /> Agreement with a.deposit equivalent to the estimated oonstrudort costs prior to approval of the Final: <br /> Map. 'A$410.QO fee currently is required-for,processing, per:Development Title Table 9 240:2,1 in <br /> addition to a copy of the.Grant Deed,;legal descriptions,,and an estimate. The,estimate and legal <br /> descriptions shall be prepared by a Registered Civil Engineer with atypical Se ction drawing on a <br /> Public Works and submitted to Public Works for'a roval. Asan o tion; <br /> form to be supplied by . pp 6p <br /> bon', <br /> Works will prepare the drawing with an estimate for an additional fee of.$175.00. The fee,due <br /> will be based on the current fee schedule. <br /> .I. This subdivision is approved for recording as a single unit. Phasing isnot approved.'(Development <br /> Title Section 9-1100.3) <br /> m. A community retention pond/terminal drainage system shall be provided to meet the requirements of <br /> the County and to provide adequate drainage for the subdivision. Hydrologic and hydraulic analyses <br /> shall be provided and demonstrate that all property, both downstream and upstream:of the <br /> discharge,will not be subject to a higher flood level as a result of the proposed drainage. <br /> (Development Title Section 9-1135.2) <br /> n. The project shall be served by a public water system conforming to the requirements of the <br /> Environmental Health Department and the Department of Public Works. The system shall provide <br /> adequate domestic and fire water supply in conformance to the requirements of the County Fire <br /> Warden and the local fire district. The applicant shall be required to pay the proportionate costs of a <br /> water supply feasibility study as well as proportionate costs for any new facilities required or <br /> expansion of existing system facilities necessary to serve the development. <br /> o, The project shall be served by a public sewer collection and treatment system constructed in <br /> conformance with the requirements of the Environmental Health Department and the Department of <br /> Public Works. A wastewater treatment plant study acceptable to Public Works and Environmental <br /> Health is required prior to approval of the improvement plans of any work within the site. <br /> (Development Title Section 9-1105.2) <br /> p. Street lighting shall be provided for the subdivision and the frontage of Chrisman Road and at the <br /> intersections of Chrisman Road and Zilli Drive and Chrisman Road and"C"Street. (Development <br /> Title Section 9-1150.11) <br /> q. The subdivider shall agree to and shall pay user fees for the utility services from the time <br /> improvements are accepted by the County until the lots are placed on the County tax rolls,or up to <br /> an 18-month period,as the case may be. (Subdivision Map Act Section 66493) <br /> r. Access rights shall be dedicated and restricted for Lots 6, 18, 31, and 31 along the frontage of <br /> Chrisman Road on the Final Map. (Development Title Section 9-1150.5) <br /> Conditions of Approval -4- PA-0400229 <br />