Laserfiche WebLink
9 <br /> In order to rezone a property from R-R to R-VL the property must have full services (wastewater <br /> treatment, water supply and storm water drainage). General Plan Growth Accommodation <br /> Implementation Nos. 4(b) and 14(a)(2) (Vol. I, pp. IV-11 and IV-14 respectively) indicate that �� I <br /> urban zones shall only be applied when adequate services can be made available for the <br /> development permitted in the zone. it is assumed the development that will occur as a result of <br /> the proposed General Plan Amendment and Zone Reclassification is a major subdivision. The <br /> General Plan requires that proposed subdivisions in urban communities be served by a public <br /> wastewater treatment system, public water supply and public drainage system (General Plan <br /> Vol. 1, pp. IV 61, 63 and 67). <br /> Wastewater Treatment �F <br /> According to the San Joaquin County Department of Public Works the County Service Area 4�h� <br /> (CSA 44) wastewater treatment plant will be expanded to accommodate the site. This project <br /> appears to be consistent with the policies of the General Plan. <br /> Water Supply <br /> The Department of Public Works has indicated that CSA 44?can serve the proposed site for <br /> water supply. The General Plan and Zone Reclassification appear to be consistent with the k <br /> requirements of the General Plan and Development Title. <br /> re <br /> q I <br /> 0 <br /> Storm Water Drainage <br /> The Department of Public Works has indicated that CSA 44 can serve the proposed site for E <br /> storm water drainage. The General Plan and Zone Reclassification appear to be consistent <br /> with the requirements of the General Plan and Development Title. <br /> LM:vb I' <br /> PA-0200371-372 'f <br /> Attachments <br /> 4 <br /> C: Sergio Zilli <br /> Linne Estates <br /> i <br /> I <br /> k <br /> 0 <br />' . II <br />