Laserfiche WebLink
WDO Inc. 209 835 9022 p, 2 <br /> S. An Offer of Dedication of groundwater rights on the Final Map is required. <br /> i <br /> t Annexation of the development into CSA 44 for storm drainage,water, and sewer shall be required. <br /> The developer shall pay all processing fees. <br /> u. -The property shall-transfer to a zone within County Service Area No.44 prior to recording the Final <br /> Map to provide for the operation,maintenance,and improvement.of storm drainage and street <br /> lighting facilities. A new assessment for the.zone shall be approved by the property owners priorto <br /> recording the Final Map. In order to receive the requested;services,the applicant must apply to <br /> transfer into a zone in CSA 44 and.complete,the Proposition 218 process for street lighting: The <br /> development will,receive services conditional upon completion of all necessary facilities and passage <br /> of the Proposition 218 vote. The assessment for the new zone shall be based on the cost for <br /> maintenance,operation,system improvements,and any replacement program of facilities within <br /> CSR 44. The applicant shall pay for the cost to process-the transfer and assessment for the new <br /> zone. In addition,the applicant shall pay for the maintenance and operation of the system from the <br /> time the facilities are accepted by the District until the transferred area is placed on the assessment <br /> role of the District (Development Title Section 9-1100:5) <br /> v. The Traffic Study has been completed. Mitigations required for this project are as follows: <br /> i <br /> (1) A traffic fight at the intersection of Linne Road and Chrisman Road shall be required in the future. <br /> The developer's fair share contribution for this portion of Phase 2 will require a payment of <br /> $2,376.68 <br /> (2) to the future,cumulative traffic will require a traffic signal at the Chrisman Road and Schulte � <br /> Road intersection. The developer's fair share contribution for this portion of Phase 2 will require <br /> a payment of$8,38$.34. <br /> (3) In the future,cumulative traffic will require a traffic signal at the Linne Road and MacArthur Road <br /> intersection. The developer's fair share contribution for this portion of Phase 2 will require a <br /> payment of$978.24. <br /> \ w. A State National Pollutant Discharge Elimination System(NPDES)Construction Permit Notice of <br /> Intent(NOI)shall be filed with the State Water Resources Control Board if over one acre of total <br /> ground is disturbed. <br /> x_ Access rights shall be dedicated and restricted for Lot 32 along the frontage of Zilli Drive on the Final <br /> Map. (Development Title Section 9-1151).5) <br /> 5 u 614G-r 70 104r gl24Io4F- <br /> 5. ENVIRONMENTAL HEALTH DEPARTMENT(Staff Contact_ .Justin Hess, 468-3453) <br /> The Surface and Subsurface Contamination Report dated December 12,2002, will need to be <br /> updated and amended. An addendum shall be submitted to the EHvironmenlal health Department <br /> with the appropriate fees at the time of submi rt shall receive approval by the <br /> Environmental Health Department prior final Map approva <br /> • b. Prior to issuance of building permit approval,backfill the septic tank,seepage pits,&excavation <br /> under permit and inspection by the Environmental Health Department. (Development Title Sections <br /> ` 9-1110.3 and 9-1110.4) NOTE: The applicant shall submit a Civil Engineered plot map showing all 1 <br /> the locations of the septic tank and leach fields for Lot 34 to the Environmental Health'Department <br /> for review and approval. If the Environmental Health Department disapproves of the location of i <br /> septic tanks and/or teach fields or should Lot 34 be sold, the applicant will be required to hook up to a <br /> public sewer system. A review fee of$186.00 is required at the time of submittal of a plot map. <br /> Conditions of Approval -5- PA-0400229 <br /> i <br /> i <br />