Laserfiche WebLink
•' k <br /> MITIGATION MONITORING PROGRAM <br /> This section provides for the monitoring of the mitigation measures <br /> identified in the Initial Study. <br /> The passage of A.B. 3180, which amends the California Environmental <br /> Quality Act, requires that all public agencies adopt reporting or <br /> monitoring programs when they approve projects with mitigating <br /> measures adopted to reduce or avoid significant impacts identified <br /> in an initial study. This monitoring program is designed to ensure <br /> compliance with mitigation methods during the implementation of the <br /> project. <br /> I <br /> IMPACT MITIGAIOiV MONItCIRINGACTIOIE RESPOI�I$IBLE TIMING <br /> AG>=Ntf <br /> Possible lose of a.All of the Heritage The Development Development Prior to <br /> Heritage Oaks. Oak Trees shall be services division will Services Division recordation of <br /> protected. No soil review the Final Map and the the Final Map <br /> compaction shall be and CC&Rs before Department of Fish and at the time <br /> allowed within 30 test recordation. and Game and the of building <br /> of the dripline of each Building permit <br /> tree. Building and grading Department. approval. <br /> permits will be checked <br /> b.All Heritage Oaks against the Final Map. <br /> shall be Indicated on <br /> the Final Map with a <br /> 30 foot buffer <br /> Indicating no soil <br /> disturbance-or <br /> compaction. <br /> c.Condition a.shall <br /> also be Included In <br /> the CC&Rs. <br /> Initial Study <br /> (Rev: 01/91) <br /> 11 <br />