Laserfiche WebLink
" IMPAC MITIGATiE1N MON[TORiNG ACTIOFI RESPONSIBLE TIMING: <br /> « AGENCY <br /> Possible loss of , A 50-foot natural The Development Development Prior to <br /> riparian habitat. setback buffer shall Services division will Services Division recordation of <br /> be established along review the Final Map and the the Final Map r <br /> each side of the and CC&Rs before Department of Fish and at,the time <br /> creek recordation. and Game and the of building <br /> A 100-foot natural Building permit <br /> setback buffer shall Building and grading Department. approval. <br /> be established around permits will be checked <br /> the pond. against the Final Map. <br /> The above buffers t <br /> shall be mapped on <br /> A the Final Map and' <br /> Included In the ' <br /> CC&R's. <br /> Loss of Vernal The vernal pools In The Development Development Prior to <br /> Pools and Wetlands. lots 7,'S,13 and 16 Services division will Services Division recordation of <br /> i and a 50-foot buffer review the Final Map and the the Final Map <br /> around them shall be and CC&Rs before Department of Fish and at the time <br /> designated as"Open recordation. and Game and the of building <br /> Space"and protected. Building permit <br /> The buffer shall be Building and grading Departmeft approval. <br /> mapped on the Final permits will be checked <br /> Map and Included In against the Final Map. <br /> the CC&R's. <br /> K <br /> t <br /> u <br /> k <br /> Initial Study (Rev: O1/91) <br /> 12 <br />