Laserfiche WebLink
' f File No. 20-3551-01 k" CtEINFELDER <br /> January 27 , 1992 <br /> On January 15, 1992 , a representative of our firm visited <br /> five residences located on and adjacent to the site. The <br /> purpose of the visits was to obtain information on septic <br /> system use and to inquire about any problems known to exist <br /> with this method of sewage disposal. Residents were home <br /> 4 at four of the locations, and they reported having no <br /> problems with the performance of their septic systems. The <br /> residents ' opinions on the quality of water produced from <br /> their private wells varied from "hard" to "excellent" to <br /> "fair. " <br /> ITEM C-2 : <br /> "The suitability of the soil for development utilizing septic <br /> systems ; " <br /> ! on January 14 , 1992 , a representative of our firm drilled <br /> and set-up four 3-foot deep percolation test holes at the <br /> approximate locations indicated on Plate I . The test holes <br /> were drilled with hand drilling equipment using a 6-inch <br /> diameter continuous-flight auger. Perforated PVC pipe was <br /> inserted into the test holes to prevent disturbance when <br /> adding water. The test holes were filled with relatively <br /> 1 clean water and were left to soak overnight. Our <br /> l representative returned to the site on January 15, 1992, <br /> I and water remained in all four test holes, which <br /> constituted-ling tests. <br /> - 1.6 our representatives drilled and set-up <br /> `t oo additional" percolation test holes in the vicinity of <br /> eachof.- fie 3-foot deep test locations. The additional <br /> test holes varied from approximately 3 to 9-1/2 feet deep. <br /> The test holes were drilled with a truck-mounted drill rig <br /> equipped with 6-inch diameter continuous-flight augers. ` <br /> Perforated PVC pipe was inserted int the test holes to <br /> prevent disturbance when adding water. The test holes were <br /> filled with approximately 3 feet of re atively clean water <br /> r the day before testing and were left to soak overnigh_ <br /> f <br /> On January 21 and 22 , 19 our representative returned to <br /> he rill the our <br /> tests. As per San <br /> Joaquin County guidelines, the tests were performed for a <br /> period of 4 hours. The last 30 minutes of each test were <br /> used to calculate the percolation rates. In order to use <br /> standard leach lines, the County requires a percolation <br /> rate of 60 minutes per inch (min/in) , or faster, at the 3- <br /> foot depth. One 3-foot deep test passed (Lot 3) with a <br /> percolation rate of 60 minutes per inch. In order to use <br /> sump pits, the County requires a percolation rate of 30 <br /> min/in, or faster, at a depth greater than 3 feet. The <br /> 4 <br /> Copyright 1992 Kleinfelder, Inc. Page 2 of 4 <br />