Laserfiche WebLink
I <br /> configuration of lot #1 . Are Department of Fish and Game or <br /> Corps of Engineers permits required in order to bridge over an <br /> existing creek bed or any other water course, if so these permits <br /> should be a condition of approval . <br /> Please keep me advised as to what the Development <br /> Committee ' s determination has been based on the issues raised and <br /> when this matter will be heard before the Planning Commission. <br /> Sinc alY, <br /> Jose L. Alva <br /> Attorney At Law <br />{ <br /> cc : Mr. John Teresi <br /> JLA/klb <br /> 3 <br />