My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012929
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLLIER
>
3706
>
2600 - Land Use Program
>
PA-03-403
>
SU0012929
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 9:31:21 AM
Creation date
9/4/2019 11:27:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012929
PE
2610
FACILITY_NAME
PA-03-403
STREET_NUMBER
3706
Direction
E
STREET_NAME
COLLIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
00514225
ENTERED_DATE
1/16/2020 12:00:00 AM
SITE_LOCATION
3706 E COLLIER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\C\COLLIER\3706\PA-0300403\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
minimum of twenty-five (25)feet for two-way aisles. A revised Site Plan showing the <br /> minimum dimensions will be required. The total number of parking spaces required is <br /> sixteen (15), with one van accessible space. The Site Plan shows twenty-three (23) <br /> parking spaces, so there is room for modification. <br /> SURFACING <br /> The Site Plan dated August 4, 2003 shows eight parking spaces and the.proposed mini;. <br /> storage facility along the west property line. The area is currently not paved. The Site Plan <br /> does not indicate where the existing asphalt paving ends and where paving is proposed. <br /> Development Title Section 9-1015.5(e) requires parking spaces, driveways, and <br /> maneuvering areas to be surfaced and permanently maintained with asphalt concrete or <br /> Portland cement concrete. A revised Site Plan showing proposed paved areas will be <br /> required. <br /> PROPANE TANK <br /> A site visit to the property on August 27, 2003 revealed the <br /> existence of a propane tank that the tank would be <br /> the property not shown on the Site Plan, The Applicant <br /> moved as part of the fuel island proposal. The revised Site Plan will be required to show <br /> the proposed location of the propane tank. <br /> �i <br /> JR:vb <br /> + PA-0300403 <br /> Attachments <br /> C: Ajmer S. & Daljit K. Gill <br /> Lang Lockrem <br /> + <br /> k <br /> I� <br /> I <br /> +I <br /> I <br /> I � z <br />
The URL can be used to link to this page
Your browser does not support the video tag.