A <br /> J Q <br /> h KKLEINFELDER <br /> r <br /> HISTORICAL GROUNDWATER DEPTH <br /> t According to groundwater reports published by the Safi .Joaquin County Flood Control and <br /> ' Water Conservation District (Spring 1993 to Spring 1999), high groundwater in the project area <br /> I' <br /> has been recorded at depths in the range of about 70 to 100 feet below ground surface. <br /> I <br /> l FIELD EXPLORATIONS AND TESTING <br /> The subsurface conditions at the proposed leach field location were explored on December 6, <br /> 2001, by drilling one boring to a depth of approximately 15 feet below existing grade, which was <br /> used for a percolation test. The boring was drilled using a Simco 2400 truck-mounted drill rig <br /> equipped with 6-inch O.D. solid-stem auger. During the same tine period, percolation borings <br /> were drilled to depths of about 3.5 and 9 feet below site grade. When the testing on these three <br /> borings was perfored on December 7, 2001, all the tests failed to ade uately percolate. Via a <br /> m <br /> telephone call with our field representative, Mr. Rodney Estrada of San Joaquin County Public <br /> Health Services (SJCPHS) stated that due to failing results, the percolation testing on these <br /> borings could be terminated without SJCPHS inspection. On December 10, additional <br /> percolation tests were installed in the same potential leachfeld area at depths of approximately <br /> 19 and 25 feet. These tests were performed on December 11, 2001. The approximate boring <br /> (and percolation tests) location is presented as P-1 on the attached plate. <br /> Based on our findings, the subsurface soils encountered consisted of approximately 4.5 feet of <br /> sandy clays over approximately I 1 feet of sandy and clayey silts, underlain by approximately 6.5 <br /> feet of silty sands. Beneath the silty sands existed sandy clay soils to the maximum depth <br /> explored of approximately 25 feet. A log of boring that describes the subsurface conditions <br /> encountered is attached. <br /> The percolation tests were performed in accordance with accepted guidelines using clear potable <br /> water. The procedure calls for first placing about 2 inches of fine gravel at the bottom of the <br /> borehole. The hole is then pre-soaked with water at least 24 hours prior to performing the test. <br /> Theperfb=ed.b-y rst addin about 6 inches of water ver 3 foot of percolation test depth <br /> to � <br /> abovc t hole. From a fixed reference point, the drop in water level is measured at <br /> approximate 30-minute intervals for four hours, refilling as necessary to maintain the prescribed <br /> amount of water over the gravel. Under the observation of a sanitarian from the SJCPHS, the <br /> last 30-minute reading of the four hour period was recorded and used to calculate the percolation <br /> summarized below. Copies of our <br /> rate in minutes per inch. The estimated percolation rates are <br /> field percolation test results for test numbers P-I and P-2 are attached. <br /> Percolation Rafe'(ii in:7in 7 <br /> Test Nµmlber <br /> P-1 3.5 Did not percolate <br /> P-2 9,0 Did not percolate <br /> P-3 15.0 Did not percolate <br /> P-4 19.0 2.2 <br /> P-5 25.0 35.7 <br /> December 20,2001 <br /> 20-4684-01.G 01/2011 R 15 70 Page 2 of 4 <br /> 2001 Klcinfeldcr, Inc. <br />