Laserfiche WebLink
fDr. Glover -2- January 22, 2000 <br /> • Although I have referred.to the ATC proposal in my pre-approval above, please be aware that <br /> you will be entering into a private contract: the State of California cannot compel you to sign <br /> any specific contract. This letter pre-approves the corrective action related costs as <br /> presented in the proposal dated May 12, 1999, by ATC.. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all'necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Pleaseinsure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the �L <br /> invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached at (916) 341-5796. <br /> Sincerely, i <br /> ---Mark Owens,Water Resources Control Engineer <br /> i <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> I <br /> cc: Ms. Margaret Lagorio <br /> li San Joaquin County Public Health Services <br /> Environmental Health Division " <br /> California Environmental Protection Agency <br /> Zj Reck%d Pepe, <br />